BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated March 28, 2025

Renovation of an educational facility in River Grove, Illinois. Completed plans call for the renovation of a educational facility.

QUESTIONS, PLEASE CONTACT Mr. John Lambrecht (312) 310-7811 or email johnlambrecht@triton.edu It is the intent of the College to select one electrical troubleshooting and repair contractor to provide repair work needed at the Triton College Campus Facilities. The objectives are to obtain the best repair services while minimizing cost to the College. All work shall be performed and supervised by a qualified master electrician. The period of the contract for electrical repair services shall commence on July 1, 2025, following approval by the Board of Trustees and shall terminate June 30, 2026. The College reserves the right to renew the contract for four additional one (1)-year periods with term changes limited to consumer price index for the Chicago metro area / industry / prevailing wage / union rates adjust ments, and a review of contract performance by vendor for the previous year. The College shall be under no obligation to renew the contract from year to year. Prices, terms and conditions shall remain firm throughout this contract period unless modified or cancelled in accordance with provisions of the bid.

Post-Bid

Educational

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
467
Active Projects
256
Bidding Soon
3,397
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

July 1, 2025

Project location map

2000 5th Ave, River Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.