BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work for a mixed-use development in Pointe-Claire, Quebec. Completed plans call for site work for a water / sewer project; and educational facility.

Reference number: 20055690 Deadline for receipt of complaints: 2025-03-25 Repair of surfaces and drainage system with retention basin at St John Fisher Senior School, located at 121 Summerhill Avenue, Pointe-Claire, QC H9R 2L8. Work required under this tender will begin on May 19, 2025 in the crawl space (except for work on the sump pit) and at certain authorized exterior locations, with all work to be fully completed by September 30, 2025, at which time provisional acceptance will be required. Work on the rest of the site will start on June 23, 2025.

Award

Water / Sewer

$2,039,865.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
222
Bidding Soon
2,816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 19, 2025

Project location map

121 Av. Summerhill, Pointe-Claire, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.