Renovation of an educational facility in Fresno, California. Completed plans call for the renovation of a educational facility.

Washington Unified School District (hereinafter referred to as "Owner") will receive sealed bids prior to the date and time stated for the Bid Opening for the award of a contract to construct the West Fresno Elementary Maintenance Building Electrical Upgrade (the "Contract"),as per the Contract Documents This Contract ---is not subject to prequalification pursuant to Public Contract Code section 20111.6. The Contract Time shall be ninety (90) calendar days, and liquidated damages for delay shall accrue. See Article III of the Agreement for details. Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum, as set forth in the Contract Documents. The Owner will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have a Class " B " or C-10 license and shall maintain that license in good standing through Contract completion and all applicable warranty periods. For all projects over Twenty-five Thousand Dollars ($25,000), bidder shall state the public works contractor registration number on the Designation of Subcontractors form for each subcontractor performing more than one-half of one percent (0.5%) of the bidder's total bid. Summary of proposed Work: Providing electrical battery chargers at the existing bus barn This portion of the work includes the furnishing of all labor and materials necessary for the complete wiring system to outlets and all equipment shown on the drawings or covered by this Section of the Specifications and other Division 26 and Division 28 sections of the Specifications. In general, the work includes the following: 1. Complete system of branch circuit wiring, conduit and distribution equipment for lights, receptacles, and power. 2. Furnish and install lighting panelboards, lamps, lighting fixtures, wall switches, convenience outlets, etc. as shown on drawings. 3. All hangers, anchors, sleeves, chases, and supports for fixtures, all electrical equipment and materials. 4. Furnish, install, and connect wire, conduit, and switches, etc. required for other equipment covered by other sections of these Specifications. 5. All excavating and backfill as required for electrical work. 6. The patching and repair of all work modified or damaged by the installation of work under this Contract. 7. Outlet boxes and conduit system for telecommunications (voice and data). 8. Demolition work. 9. Terminal cabinets and backboards. 10. The Contractor shall furnish and install all work necessary to make complete systems, whether or not such details are mentioned in these Specifications or shown on the drawings, but which are necessary in order to make complete working systems, excepting only those portions that are specifically mentioned therein or plainly marked on the accompanying drawings as being installed by other Contractors. 11. Electrical Contractor must coordinate his work with the work of other trades so as to provide raceways, conductors and outlets in the correct location for the equipment served, including all built-in appliances, mechanical, and signal equipment and connect same. Electrical Contractor must provide power of the correct voltage and phase to each item of equipment. 12. Before construction starts, the Electrical Contractor shall arrange a coordination meeting with the General Contractor and all other subcontractors supplying equipment that requires electrical connections. All electrical requirements shall be verified, and any problems shall be immediately reported to the Architect. Equipment items to verify shall include, but not be limited to: Voltage, amps, phase, location, orientation, space

Bid Results

Educational

$150,800.00

Public - County

Renovation

12

8

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
18
Bidding Soon
712
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

Project location map

2910 S Ivy Ave, Fresno, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.