Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Site work and paving for a civil project in Canton, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The Project generally consists of the following major items: 1. Supply and installation of a 1.5 MG composite style elevated tank. 2. Supply and installation of a pump station inside the tank concrete column, which will include three pumps not exceeding 50 HP, constant speed motors for each pump, all control components, piping, and valving. 3. Supply and installation of approximately 700 feet of 16-inch DIP water line and all tie-ins of water piping and electrical utilities. 4. Relocation and installation of a 200 kW diesel backup generator, with associated automatic transfer switch. 5. Demolition and removal of the existing Ridge Pine Booster Pump Station. 6. Demolition and removal of the existing 0.5 MG Ground Storage Tank. 7. Demolition and removal of the existing K-Mart Booster Pump Station. 8. Decommissioning of the existing 0.2 MG Ridge Pine Elevated Storage Tank. 9. Pine Crest Drive improvements. 10. Site improvements including retaining wall installation, pavements and bioswales installation, stormwater pipes installation, and landscaping. 11. All associated civil/sitework, piping, structural, electrical, and instrumentation work for the completion of the project. Bidders shall inform themselves concerning Georgia Laws and comply with same. The contractor shall have an EMR rate of less or equal to 1.0. The time allowed for Substantial Completion is 550 days, and the time allowed for Final Completion and readiness for final payment is 580 days from the date of commencement. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the OWNER for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, a certified check, cashier's check, or cash in equal amount. The successful bidder will be required to furnish the necessary additional Bond(s) as described in the Bidding Documents. All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive informalities and re-advertise. Question Deadline: 04/04/2025 at 4:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Josh Johnston
Bid Results
Water / Sewer
$18,340,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
June 23, 2025
2939 Marietta Hwy, Canton, GA
Related To This Project
Canton, GA
Bid Date: Apr 18 2025
Canton, GA
Bid Date: Apr 18 2025
Canton, GA
Bid Date: Apr 17 2025
Canton, GA
--
Canton, GA
Bid Date: Apr 17 2025
Canton, GA
Bid Date: May 13 2025
Canton, GA
Bid Date: May 08 2025
Canton, GA
Bid Date: May 15 2025
Canton, GA
Bid Date: Mar 31 2025
Canton, GA
Bid Date: Apr 24 2025
Canton, GA
Bid Date: Mar 05 2025
Canton, GA
Bid Date: Mar 27 2025
Canton, GA
Bid Date: Mar 20 2025
Canton, GA
Bid Date: Apr 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.