BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work for a water / sewer project in Arlington, South Dakota. Completed plans call for site work for a water / sewer project.

The MBE goal for this project is 1.5% of the total dollar value of the job while the WBE goal is 2.4% of the total dollar value of this job. Water Transmission Pipelines, Waterlines, Water and Wastewater Facilities. Est. Completion Date: July 17, 2026. The Project includes the following work: Construction of approximately 4 miles of 16-inch raw water pipeline, 1 mile of 16-inch, 7 miles of 12-inch, and 4 miles of 10-inch transmission pipeline along 204th Street and 425th Avenue. The Project includes directionally drilled crossings, mainline valves, flushing hydrants, control vault, and other appurtenant work. Document note: Download delivery fee is $22.00, file size is 47 MB. Question Deadline 04/08/2025

Award

Water / Sewer

$5,340,449.00

Public - County

Site Work

50

25

22

8

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
10
Bidding Soon
344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

Multiple Locations, Arlington, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.