BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

Site work and paving for a mixed-use development in Pewaukee, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered to the City of Pewaukee at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to the City of Pewaukee equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to the City of Pewaukee as liquidated damages. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all Plan Holder's of Record. Questions received from Bidders that do not, in Engineer's opinion, allow sufficient time to respond prior to the date for opening of Bids will not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Est. Completion Date: Aug. 15, 2025 Pre-Qualification: Yes Pre-Bid Meeting Info: There will be no pre-bid meeting. Project involves 1,925 L.F. of 12-inch and 215 L.F. of 8-inch water main installation and appurtenances, 543 L.F. of 8-inch sanitary sewer installation and appurtenances, curb and gutter replacement, pavement replacement, traffic control, erosion control, and restoration. The Project Manager for this Project is Brennen E. Fischer, P.E., who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188-1020, (262) 542-5733, regarding the Project. All Work is included in a single prime contract.

Award

Water / Sewer

$1,533,228.00

Public - City

Paving, Site Work

34

18

12

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
226
Bidding Soon
2,283
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 26, 2025

Project location map

Multiple Locations, Pewaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.