Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 9, 2025 at 8:00 PM
Updated April 10, 2025
This is a service / maintenance or supply contract in Dallas, Texas. Contact the soliciting agency for additional information.
The objective of the Main Stem Balancing Reservoir (MSBR) Feasibility Study is to advance the evaluation of the MSBR strategy from the planning level included the Long Range Water Supply Plan (LRWSP) to a feasibility level by identifying potential challenges in implementing the project; evaluating the associated risk and level of effort to overcome these challenges; providing recommendations, timelines, and budgets, for additional studies, permitting and design; preliminary design of the dam/embankment, riverine intake and pump station, MSBR intake and pumpstation and transmission line to connect to DWU's water supply system. All designs and cost estimations should be in line with a maturity level as described in the AACE International Recommended Practice 18R-97 Class 4. Question Deadline 04/04/2025 at 1:00 PM CT Online Portal The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2025
Multiple Locations, Dallas, TX
Related To This Project
Dallas, TX
--
Dallas, TX
Bid Date: Mar 21 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Apr 04 2025
Dallas, TX
Bid Date: Mar 17 2025
Dallas, TX
Bid Date: Mar 19 2025
Dallas, TX
Bid Date: Apr 11 2025
Dallas, TX
--
Dallas, TX
Bid Date: Mar 21 2025
Dallas, TX
--
Dallas, TX
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
