BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work for a water / sewer project in Jordan, Montana. Working plans call for site work for a water / sewer project.

Pre-solicitation Notice For Keystone Lake Tainter Gate Repair, Keystone Lake, Oklahoma This is a PRE-SOLICITATION NOTICE for the construction of the Keystone Lake Tainter Gate Repair, Keystone Lake, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers - Tulsa has been tasked to solicit for and award a contract for the repairs to the Tainter Gates at Keystone Lake Dam, in Oklahoma. The proposed design-bid-build project will be procured as an unrestricted, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted. Project Description: This project consists of repair to the floating bulkhead and tainter gates at Keystone Dam. The bulkhead will be visually inspected, and welds will be nondestructively tested. Suspect welds and compromised support steel will be replaced or repaired. Additionally, the interior and exterior of the bulkhead will be sandblasted and painted, anodes will be replaced, seals will be replaced, and the jib crane will be replaced. The gates will be visually inspected, and fracture critical welds will be nondestructively tested. Suspect welds and compromised steel will be replaced or repaired. Additionally, the gates will be sandblasted and painted. In accordance with FAR 36 and DFARS 236, the estimated magnitude of construction for this project is between $5,000,000 and $10,000,000. The North American Industry Classification System code for this procurement is 237990 (Other Heavy and Civil Engineering Construction) which has a small business size standard of $45M. Estimated duration of construction of this project is 425 calendar days. Anticipated solicitation issuance date is on or about 3 December 2025, and the estimated proposal due date will be on or about 30 January 2026. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
15
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

Project location map

To Be Determined, Jordan, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.