BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated March 19, 2025

Site work for a sidewalk / parking lot in Asheville, North Carolina. Conceptual plans call for site work for a sidewalk / parking lot.

City of Asheville, eastbound side of Broadway Street, from the I-26 ramp to the intersection with W.T. Weaver Blvd. The project is primarily located within North Carolina Department of Transportation (NCDOT) right-of-way. Project History Greenways have been a key component of City initiatives and master planning for over two decades. They are understood as critical "green infrastructure" that provide a valuable pedestrian and bicycle-focused transportation network as an alternative to the traditional vehicular-focused network. Greenways are also recognized as green spaces that offer significant environmental, psychological, and physical health benefits. (See Greenways of Asheville) Ushering greenway visions and plans into construction requires years of dedicated, well-informed coordination between a diverse group of public and private stakeholders, including City, County, State, and Federal agencies. The Capital Projects Management Division seeks a Consultant to complete a comprehensive design for Phase I of the north extension of the Re-ed Creek Greenway, identified as "North Re-ed Creek Greenway Phase I". The design intent is to increase the City's greenway network, creating a safe, context-sensitive, ADA-compliant shared-use path that aligns with the recommendations in the 2024 Re-ed Creek Greenway Feasibility Report, the aesthetic of the existing Re-ed Creek Greenway, and City, County, and State greenway initiatives. The work includes, but is not limited to, the design of a ~0.39 mile greenway that extends the existing Re-ed Creek Greenway north towards Riverside Drive. The greenway shall include a continuous, 12-foot wide paved pathway that follows, in general, the alignment described under "Alternative #1C, Hillside and Roadside" of the referenced Re-ed Creek Greenway 2024 Feasibility Study. (The Consultant may propose modifications to this alignment based on their assessment.) In all aspects the design shall comply with applicable Americans with Disabilities Act (ADA) Standards for Accessible Design and Public Right-of-Way Accessibility Guidelines (PROWAG). It shall also comply with all applicable Municipal, State and Federal regulations. A detailed description of the scope of work for each of the mentioned services will be provided to the Selected Consultant at a later date as part of a Request for Fee Proposal. Design is anticipated to be completed within 12-15 months from Award. April - May 2025: Design Team Selection, Award and Contracting June 2025 - June 2026: Project Design for North Re-ed Creek Greenway PH I July - September 2026: Construction Bid Process and Award for North Re-ed Creek Greenway PH I October 2026 - October 2027: Construction of North Re-ed Creek Greenway PH I Deadline to Submit Questions 5:00 PM, Thursday, March 13, 2025 Projected Project Start May 2025 Drug Free Workplace: The City of Asheville is a drug-free workplace employer. By submitting this bid, the prospective contractor certifies that if awarded the contract, they and their subcontractors shall comply with the following: The City requires contractors/vendors entering into a contract with the City to provide a drug-free workplace in the performance of said contract. The contractor, upon execution of the contract, certifies that it will provide a drug-free workplace during the performance of the work on this contract. The contractor agrees to do the following: Notify employees that the unlawful manufacture, distribution, dispensation, possession or use of a controlled substance is prohibited in the workplace and specify the actions that will be taken for violations of such prohibitions. Responsive actions should be appropriate and sufficient to address and remediate any violations of this requirement. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$4,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
116
Bidding Soon
1,317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.