EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 2, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Edmond, Oklahoma. Completed plans call for the renovation of a educational facility.

The intent of the following is to describe the Scope of Work included in each bid package. The bid shall include all the requirements in the specification sections listed unless specifically excluded below. There are three categories of bid packages--Labor and Material (L & M), Material only (M), and Labor and Equipment (L & E). (1) Labor and Material Bid Packages (L & M): Each separate package shall include all labor, materials, equipment, services, and incidentals required for a complete installation. The bid shall also include all General Condition items relative to each Scope of Work. Successful Labor Bid Package bidders must provide General Liability, Auto, and Workers' Compensation with a Certificate listing Additional Insured and Waiver of Subrogation in favor of the Owner, Architect, Construction Manager, and Funding Entity. (2) Material Only Bid Packages (M): Each separate package shall include all labor, materials, services, and incidentals required for complete fabrication, manufacture, and delivery to the project site of the materials included in the designated specification sections and drawings. (3) Labor and Equipment Bid Packages (L): Each separate proposal shall include all required labor and equipment to incorporate into the project specifically designated materials furnished by other bid packages. Successful Labor Bid Package bidders must provide General Liability, Auto, and Workers' Compensation with a Certificate listing Additional Insured and Waiver of Subrogation in favor of the Owner, Architect, Construction Manager, and Funding Entity. (4) Clarification: If any bidder is unclear about the Scope of Work required, contact the Architect/construction manager before bidding. Prior approval is required for all bid packages. (5) C.M. may bid on any bid packages. (6) Owner reserves the option to award or reject any and all bid packages Bid Package No. 01-Electrical

Post-Bid

Educational

$300,000.00

Public - City

Renovation

9

11

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Clocks
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
37
Bidding Soon
505
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 27, 2025

img_map_placeholder

17601 N Pennsylvania Ave, Edmond, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

West Field Elementary Lighting Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.