Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 30, 2025 at 8:00 PM
Updated May 1, 2025
Site work for a pipeline in Fairhope, Alabama. Completed plans call for site work for a pipeline.
Furnishing All Labor and Materials, and Performing All Work Required by the City of Fairhope and Described as Follows: Bid Number 25- 028 Fairhope Cast Iron Replacement Phase 2 the City of Fairhope is Requesting Responses From Qualified Contractors to Construct Approximately 34,340' of 2" Pe, and 510' of 4" Pe Gas Mains. Contractor Will Install New Gas 3/4" Pe Service Lines From Main to Meter to Serve Approximately 610 Existing Gas Customers and Perform Tieins for the New 2" and 4" Gas Mains. Existing Gas Mains and Existing Gas Service Lines Will Be Retired in Place. The System Will Be Designed and Tested to Operate at 60 Psig. Question Deadline 03/31/2025 at 11:00 AM CT Questions or Comments Pertaining to This Bid Must Be Presented in Writing, Sent as E-mail to the Attention of the Purchasing Manager, Erin Wolfe, 555 South Section St., Fairhope, Al 36532, E-mail: Purchasing@fairhopeal.gov, Or Will Be Forever Waived. The City of Fairhope is an Equal Opportunity Employer and Requires That All Bidders Comply With the Equal Employment Opportunity Laws and the Provisions of the Contract Documents in This Regard. The City Also Encourages and Supports the Utilization of Minority Business Enterprises on This and All Public Bids. All Bids Must Be on Blank Bid Forms Provided in the Bid Documents. All Bids, With Their Guarantee (When Required), Must Be Enclosed in a Sealed, Opaque Envelope, Clearly Identified on the Outside as a "sealed Bid" With Item Name, Bid Number, City of Fairhope's Name and Address and Contractor's Name and Address. Failure to Observe the Instructions Contained Herein Will Constitute Grounds for Rejection of Your Bid. The City Reserves the Right to Accept or Reject All Bids or Any Portion Thereof, and to Waive Informalities and to Furnish Any Item of Material or Work to Change the Amount of the Contract, Whichever is in the Best Interest of the City of Fairhope. No Bids Will Be Considered Unless the Contractor, Whether Resident or Non-resident of Alabama, is Properly Qualified to Submit a Proposal for This Type of Work in Accordance With All Applicable Laws of the State of Alabama. Where Applicable, This Shall Include Evidence of Holding a Current License From the State Licensing Board for General Bidders, Montgomery, Alabama, as Required by Chapter 8 of Title 34, of the Code of Alabama, 1975. In Addition, the Awarded Vendor, if Non-resident of the State, and if a Corporation, Shall Show Evidence of Having Qualified With the Secretary of State to Do Business in the State of Alabama. Contractor Must Have a Current Business License or Purchase a Business License With the City of Fairhope Prior to Work Performed. No Bids Shall Be Withdrawn for the Period of Thirty (30) Days Subsequent to the Opening of Proposals Without the Consent of the City of Fairhope, Baldwin County, Alabama. Once Completed, a Tabulation of the Responsive and Responsible Bids Will Be Available for Public Viewing by online.
Award
Pipeline
$4,107,412.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
May 8, 2025
Multiple Locations, Fairhope, AL
Related To This Project
Fairhope, AL
Bid Date: Apr 24 2025
Fairhope, AL
--
Fairhope, AL
Bid Date: May 01 2025
Fairhope, AL
Bid Date: May 09 2025
Fairhope, AL
Bid Date: May 15 2025
Fairhope, AL
--
Fairhope, AL
--
Fairhope, AL
Bid Date: May 09 2025
Fairhope, AL
Bid Date: Apr 09 2025
Fairhope, AL
Bid Date: Mar 25 2025
Fairhope, AL
Bid Date: Mar 25 2025
Fairhope, AL
Bid Date: Apr 02 2025
Fairhope, AL
--
Fairhope, AL
Bid Date: Mar 13 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
