Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 30, 2025 at 8:00 PM
Updated May 1, 2025
Site work, paving and outdoor lighting for a mixed-use development in Osceola, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and playground / park / athletic field.
Project Category Code: Parks, Recreation, Trail Work, Landscaping (Tree and Shrub Clearing), Construction, Retaining Walls, Sidewalks/Curbs/Gutters, Concrete/Formed/Flatwork/Foundation, Electrical Installation/Construction, Grade, Surface and Bridge, Fencing/Guardrails/Handrails, Concrete/Shotcrete/Sprayed, Landscaping, Erosion Control - Temporary, Landscaping (Retaining Walls), Pedestrian Improvements, Design-Build, Sitework/Excavating and Grading, Grubbing & Clearing, Bridges/Overpasses. Description: The Project includes the following Work: • Removals: excavation common, landscaping, clearing and grubbing, existing site amenities, curb and gutter, and existing stairway. • Erosion Control: Erosion mat, silt fence, silt fence maintenance, sediment logs, and inlet protection. • Site Improvements: Concrete sidewalk improvements, colored concrete sidewalk improvements, aggregate base, asphalt patching, curb and gutter, railings, segmental retaining wall, concrete seat wall, prefabricated aluminum stairs, landings and platforms, associated foundations and bracing, picnic tables, benches, fences, site grading, and imported granular fill. • Electrical: • Remove and reinstall light pole to accommodate additional lighting. • Install of two (2) new Post Top Light poles matching existing for site lighting, wire and associated conduit. • Site and Turf Restoration: Site and turf restoration, plantings, general site clean-up and amenities installed. • The Project includes the following Alternates: additional site furnishings, wood rail cap, additional fence, landing replacement, additional clearing, hydroseeding, additional lighting. • Proposed Schedule: Tentatively award the work by April 8,2025. Substantial project completion is desired for seeding by late September 2025.
Award
Roads / Highways
$1,224,145.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 6, 2025
To Be Determined, Osceola, WI
Related To This Project
Osceola, WI
Bid Date: Jul 01 2025
Osceola, WI
Bid Date: Nov 06 2025
Osceola, WI
Bid Date: Nov 06 2025
Osceola, WI
Bid Date: Mar 28 2025
Osceola, WI
Bid Date: Mar 06 2025
Osceola, WI
Bid Date: Apr 07 2025
Osceola, WI
Bid Date: Aug 08 2024
Osceola, WI
--
Osceola, WI
Bid Date: Jul 08 2024
Osceola, WI
Bid Date: May 09 2024
Osceola, WI
Bid Date: Mar 21 2024
Osceola, WI
Bid Date: Feb 08 2022
Osceola, WI
Bid Date: Aug 03 2023
Osceola, WI
Bid Date: Jun 22 2023
Osceola, WI
--