Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2025 at 8:00 PM
Updated March 27, 2025
This is a service / maintenance or supply contract in Avenal, California. Contact the soliciting agency for additional information.
The California Prison Industry Authority (CALPIA) requires preventative maintenance and repair services for various refrigeration equipment located in the Poultry Processing Plant at Avenal State Prison (ASP) in Avenal, California. Contractor agrees to provide California Prison Industry Authority (CALPIA) with a Preventative Maintenance Program (PMP) and repair service for various refrigeration equipment located at the Poultry Processing Plant at Avenal State Prison (ASP). A. The Contractor shall furnish all labor, including travel and per diem, materials, non consumable supplies, transportation, equipment, and every other item of expense necessary to perform services. B. Services shall be performed on, but not limited to, the equipment delineated in the Equipment List, Exhibit A, which is attached hereto and made a part of this agreement. i. ii. iii. CALPIA reserves the right to delete from, and/or add refrigeration units to, the equipment list established within this agreement. Equipment removals and/or additions shall be issued to the Contractor in writing by the CALPIA Project Representative, or designee. Any additional equipment will be serviced at the rates specified on the Cost Sheet, Attachment 3. 2. The services shall be performed at the CALPIA Poultry Processing Plant located at: A. Avenal State Prison (ASP) #1 Kings Way Avenal, CA 93204 3. The services shall be provided during normal working hours from 7:00 AM to 4:00 PM, Monday through Friday, as directed by the CALPIA Project Representative, or designee. 4. Service shall be available not later than the express date set by CALPIA and the Contractor, after all approvals have been obtained, the agreement is fully executed, and an ERP LX Tracking Number is issued. Should the Contractor fail to commence work at the agreed upon time, the CALPIA, upon five (5) days written notice to the Contractor, reserves the right to terminate the agreement effective immediately. In addition, the Contractor shall be liable to the CALPIA for the difference between Contractor's bid price and the actual cost of performing work by another best value contractor.
Post-Bid
Jails / Prisons
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 15, 2025
1 Kings Way, Avenal, CA
Related To This Project
Avenal, CA
Bid Date: Apr 15 2025
Avenal, CA
Bid Date: Aug 21 2025
Avenal, CA
Bid Date: Aug 27 2021
Avenal, CA
Bid Date: Sep 26 2025
Avenal, CA
Bid Date: Mar 21 2025
Avenal, CA
Bid Date: Mar 12 2025
Avenal, CA
Bid Date: Mar 26 2025
Avenal, CA
Bid Date: Feb 27 2025
Avenal, CA
Bid Date: Jan 30 2025
Avenal, CA
Bid Date: Oct 10 2024
Avenal, CA
Bid Date: Sep 20 2024
Avenal, CA
Bid Date: Aug 13 2024
Avenal, CA
Bid Date: Jul 29 2024
Avenal, CA
Bid Date: Aug 07 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
