BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Site work and paving for a road / highway in Sister Bay, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Liberty Grove is soliciting bids/quotes for the following in 2025: Pulverize compact and pave with hot mix asphalt, compacted to the listed thickness: Europe Bay, Timberline to Lake Michigan + cul de sac, 0.95 mile, 20 ft. wide, 3.0" Porcupine Bay Hill, Porcupine Bay Rd to Green Bay waters + cul de sac .25 mile, 20 ft. wide, 3.0" North Appleport, Appleport to North terminus + cul de sac, 0.90 mile, 20 ft. wide, 3.0." Appleport, CTH ZZ to easterly terminus + cul de sac, 0.98 mile, 20 ft wide, 3.0" Wildwood, CTH ZZ to Old Stage, 1.5 mile, 24 ft. wide, 4.0" Alternate bid: Pave North Badger, Garrett Bay to termini + cul de sac, .18 mile, 20 feet wide, 3" thick Note: Bidder to take into account paving radius at intersections. Additional requirements: Work to be completed prior to May 25, 2025. Follow pulverizing with a rubber-tired roller. Compact ahead of paver. Bidder to grade after pulverizing and also the finished grading prior to paving. Notify Town office prior to staking. Two lifts of LT 58-28 S per WDOT specifications-bidder to state price per ton in place of asphalt mix. Asphalt specification: LT 58-28 S hot mix asphalt per the latest edition of the WDOT specifications, section 460.3.1. Materials shall conform to sections 450, 455 and 460 of the latest edition of WDOT specifications, and current WDOT ASP 6, 460.2.1, which include the regression of air voids from 4.0% to 3.0% with asphalt cement. Omitted requirements: nominal thickness (sec. 460.3.2); ride quality and testing (sec. 440); nuclear density (sec. 460.3.3); PG binder and tack coat sampling & testing (sec. 455.2.2 and 455.2.3); cold weather paving (sec. 450.3.2.1); and safety edge (sec. 450.3.2.11). Additional: testing of asphalt mix per section 460.2.8 shall be done to verify required air void specifications. Documentation of testing and load weight slips shall be provided to Town within 15 days of project completion. Alternate bid: Hot mix asphalt surface course, 3 inches thick after compaction, omit section 460.2.1 (2) regression of air voids with asphalt cement. Deduct $ ______ per ton. Certificate of insurance must accompany bid. The Town of Liberty Grove reserves the right to accept or reject any or all bids it deems to be in the best interest of the Town, to accept any part or combination thereof, to waive any technicalities, and to accept any proposal deemed most advantageous to the Town, including the purchase of larger material quantities at the same cost per ton quoted price. Town reserves the right to postpone award of the work for a period not to exceed 30 days from the date of bid opening. Bids shall remain firm for that period of time.

Award

Roads / Highways

$902,681.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
21
Bidding Soon
358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.