Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a road / highway in Mounds View, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 25, 2025, the project was awarded to Northwest Asphalt Inc. but the awarded amount is not available.** 2025 Street Improvement Project in General and Pursuant to Minnesota Statutes, the Work Consists of the Construction of Storm sewer Improvements and Street Construction with Approximately the Following Quantities: 9501 Sy Full Depth Reclamation3424 Ton Bituminous Pavement Mixtures4592 Sf Concrete Sidewalk2504 Lf Concrete Curb and Gutter Design1 Ls Lighting System. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance Withthe Instructions to Bidders.for This Project, the City Will Only Accept Online Electronic Bids Through at online. The Successful Bidder Must Be a "Responsible Contractor." the Term "Responsible Contractor" Means a Contractoras Defined in Minnesota Statutes, Section 16c.285, Subdivision 3. Any Prime Contractor, Subcontractor, or Motorcarrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not Aresponsible Contractor and is Not Eligible to Be Awarded a Construction Contract for the Project or to Perform Workon the Project. A Prime Contractor, Subcontractor, or Motor Carrier That Makes a False Statement Under Oathverifying Compliance With the Minimum Criteria Will Be Ineligible to Be Awarded a Construction Contract on Theproject, and the Submission of a False Statement May Result in Termination of a Contract Awarded to a Primecontractor, Subcontractor, or Motor Carrier That Submits the False Statement. A Prime Contractor Shall Include in Itsverification of Compliance a List of All of Its First-tier Subcontractors That It Intends to Retain for Work on Theproject. Before Execution of a Construction Contract, a Prime Contractor Shall Submit a Supplemental Verificationunder Oath Confirming That All Subcontractors and Motor Carriers That the Prime Contractor Intends to Use Toperform Project Work Have Verified to the Prime Contractor, Through a Signed Statement Under Oath by an Owneror Officer, That They Meet the Minimum Criteria for a Responsible Contractor.don Peterson, Public Works Directorcity of Mounds View, Minnesota The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Daysafter the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After Thedate and Time Set for the Opening of Bids.the Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities Therein, Andfurther Reserves the Right to Award the Contract to the Best Interests of the Owner. Question Deadline 03/28/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information for such questions provided in the Advertisement for Bids.

Award

Roads / Highways

$894,360.00

Public - City

Paving, Site Work

58

17

8

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
190
Bidding Soon
1,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 5, 2025

Project location map

Multiple Locations, Mounds View, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.