Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 7, 2025 at 8:00 PM
Updated October 25, 2025
Demolition, site work, paving, outdoor lighting and new construction of a civil project in Stuart, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; and water / sewer project.
District:08 Counties: Martin Road Name: Bridge Replacement - 890083 (SR 91) (Mp 138) Martin County Limits: 89470000 Project(s): 44852415201(*) Federal Aid No: N/A Total Roadway Length: 0.543 Miles Total Bridge Length: 0.058 Miles Total Proposal Length: 0.601 Miles Contract Days: 763 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Please read the full advertisement Description: Work consists of providing all labor, materials, equipment and incidentals necessary for replacing Bridge 890083 located south of Becker Road on Florida's Turnpike (State Road 91). Major work includes bridge replacement, pavement realignment (reconstruction/widening), milling and resurfacing, maintenance of traffic (MOT) plan, signing and pavement marking, intelligent transportation systems (ITS), drainage, and lighting improvements from MP 19.706 in Martin County to MP 0.625 in St. Lucie County. No Pre-Bid Conference. Contractor must be prequalified. Question Deadline 05/06/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 - Intermediate Bridges/Grading - State Road 91
Award
Bridges / Tunnels
$42,536,073.00
Public - State/Provincial
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
July 14, 2025
FL-91, Stuart, FL
Related To This Project
Stuart, FL
Bid Date: Apr 16 2025
Stuart, FL
Bid Date: Jun 25 2025
Stuart, FL
Bid Date: May 07 2025
Stuart, FL
Bid Date: May 13 2025
Stuart, FL
Bid Date: Jun 05 2025
Stuart, FL
Bid Date: Jul 24 2019
Stuart, FL
Bid Date: Jun 09 2025
Stuart, FL
Bid Date: May 23 2025
Stuart, FL
Bid Date: Apr 14 2021
Stuart, FL
Bid Date: Mar 26 2025
Stuart, FL
Bid Date: Apr 02 2025
Stuart, FL
Bid Date: Mar 26 2025
Stuart, FL
Bid Date: Feb 19 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
