Published April 9, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Egg Harbor Township, New Jersey. Completed plans call for the renovation of a educational facility.

Disclaimer: IN ORDER FOR YOUR BID TO BE CONSIDERED A LEGAL BONAFIDE BIDDER ON THE PROJECT, DOCUMENTS MUST BE PURCHASED FROM REMINGTON, VERNICK ENGINEERS DIRECTLY Document note: Electronic Copies of the Bid Forms, Contracts and Specifications May Be Obtained From Said Remington and Vernick Engineers, by Prospective Bidders Upon Request, Upon Payment of the Sum of $50.00 for Each Set. Hard Copies of the Bid Forms, Contracts and Specifications Are Available Upon Request. Please Send Requests for Copies of Electronic Bid Documents to Ehtoffice@rve.com. Prospective Bidders Must Call Remington & Vernick Engineers at 609-645-7110 Prior to Obtaining the Plans and Specifications in Order to Schedule a Time to Obtain Said Plans and Specifications. Payment Must Be Received Prior to Obtaining Said Specifications, Either by Mail or in Person. No Bids Are to Be Dropped Off at the Engineer's Office. Bids must be on the bid form prepared by Remington and Vernick Engineers, in the manner designated therein and required by the specifications, must be enclosed in sealed envelopes bearing the name and address of the bidder on the outside and also bearing on the outside reference to the particular work bid upon. The Board of Education reserves the right to reject any or all bids, either in whole or in part and also waive any informality in any bid or bids received, in accordance with applicable law. The Project Will Be Broken Into Two (2) Phases. Contractor Will Be Given Full Access to the School During The 2025 Summer Recess for Phase 1 Construction and Access to the Mechanical Room Will Be Unrestricted During Both Phases. Contractor Must Ensure That All Phase 1 Construction is Complete, Demobilized, Site Restored, and All HVAC Systems in Proper Working Order Prior to the Commencement of The 2025-2026 Heating Season and All Phase 2 Construction is Complete, Demobilized, Site Restored, and All HVAC Systems in Proper Working Order Prior to the 2026 Cooling Season. See Scope of Work for Detailed Phasing Schedule. Each bid shall be accompanied by a certified check, cashier's check or bid bond duly executed by the bidder as principal and having as surety thereon a surety company approved by the Board of Education in an amount not less than ten percent (10%) but in no case in excess of $20,000.00 of the amount bid. Any such bid bond shall be without endorsement or conditions. Any such bid bond shall be without endorsement or conditions. The bidder must be pre-qualified by the New Jersey Schools Development Authority and the New Jersey Department of the Treasury, Division of Property Management and Construction, and have a valid up-to-date notice of classification prior to the date that bids are received. Any bid submitted under the terms of the New Jersey statutes not including a copy of a valid and active pre-qualification/classification certificate will be rejected as being non-responsive to the bid requirements. Each Bidder will submit with their bid a Certificate of Consent of Surety as per N.J.S.A. 18A:18A-25 from a Surety Company stating that it will provide the bidder, if successful, with a Performance/Payment Bond in the full amount of the contract. The award of the contract shall be made subject to the necessary moneys to do the work being provided by the Egg Harbor Township Board of Education in a lawful manner. The contract to be executed by the successful bidder will provide that it shall not become effective until the necessary moneys to do the work have been provided by the Egg Harbor Township Board of Education in a lawful manner. The award shall further be subjected to the securing of necessary State, Federal or Local permits governing the work. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening thereof. Bidding shall be in conformance with the applicable requirements of N.J.S.A. 18A:18A-1 et seq., pertaining to the "Public School Contracts Law". All Bidders are placed on notice that they are required to comply with all requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27, Affirmative Action, current regulations, N.J.S.A. 34:11-56.25 et seq., New Jersey Prevailing Wage Act, and American With Disabilities Act of 1990 (42 U.S.C. S12101, et seq.). All Bidders must comply with all requirements of Federal, State and Local and current applicable regulations. The contractor is further notified that he must comply with N.J.S.A. 52:25-24.2 and submit a Disclosure Statement listing stockholders with his bid. The contractor is further notified that he must comply with N.J.S.A. 34:11-56.48 et seq. Public Works Contractor Registration Act and he and any subcontractors must be registered in accordance with the act. The contractor is also further notified that he must comply with N.J.S.A. 52:32-44 and submit proof of business registration and submit proof of business registration for any named subcontractors in accordance with the act. Question Deadline - 03/21/202 - A Questions Deadline been established. Question(s) received after this date shall not be reviewed and response(s) shall not be provided.

Post-Bid

Educational

$600,000.00

Public - City

Renovation

17

25

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Vapor Retarders, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Flooring, Flooring Treatment, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Central Cooling Equipment, Packaged Water Chillers
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
104
Bidding Soon
1,628
All Active Projects
779
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

img_map_placeholder

11 Swift Dr, Egg Harbor Township, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Improvements - Slaybaugh Primary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.