EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Elizabethtown, Kentucky. Design plans call for the renovation of a educational facility.

The Kentucky Community and Technical College System, Office for Facilities Support Services, (FSS) is seeking professional design services for the Kentucky Community and Technical College System (KCTCS) Elizabethtown Community and Technical College (ECTC) to complete OTB - Phase II Renovations in Elizabethtown, Kentucky. KCTCS has an original appropriation and/or authorization from the Commonwealth of Kentucky General Assembly that is expected to allow for the design and construction of the project. The Kentucky Community and Technical College System, Office for Facilities Support Services, on behalf of Elizabethtown Community & Technical College (ECTC) desires to procure professional architectural services and an associated project team to accomplish the Phase II renovation of the Occupational Technology Building (OTB) on their main campus in Elizabethtown, Kentucky. This is a continuation of a multiple phased project currently underway. Funding for Phase 2 of this project has been appropriated by the Kentucky General Assembly in the amount of $44,000,000. This establishes the total project budget for Phase 2 to be $44,000,000 with an estimated Construction budget of $33,000,000. The Funding for Phase II currently available, therefore, the design work for Phase II will commence immediately and renovation of Phase 2 (200 and 300 portions of the existing building and any additions designed) of this building will begin while the construction of Phase 1 is still underway. The design team for Phase I of this project is led by Ross Tarrant Architects for Architecture, Interior Design, Civil Engineering and Landscape Architecture, with team members including Bacon Farmer Workman Engineering and Testing (Structural Engineers), Marcum Engineering LLC (Mechanical/ Electrical/ Plumbing) and a Commissioning Authority to be contracted by KCTCS. However, there are no assurances given that this team will continue with Phase II of this project. Andy Casebier, Assistant Vice President for Facilities Support Services, 300 North Main Street, Versailles, Kentucky 40309, Phone: (859) 256-3287, Email:andy.casebier@kctcs.edu. Project Budget:$44,000,000 Total Project $35,000,000 Available for Construction (estimated) It should also be noted that the Kentucky Community and Technical College System, Office for Facilities Support Services reserves the right to determine if the CM/GC's contract is extended to include Phase 2 of this project. This determination at the time most advantageous to KCTCS/ ECTC and will consider the performance of the CM/GC during Phase 1 of this projects as well as all other factors and considerations that are in the best interest of KCTCS and ECTC. The method of Contractor Selection has not been Determined at this time.

Design

Educational

$35,000,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, References, Definitions
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers, Postal Specialties
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
38
Bidding Soon
687
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

img_map_placeholder

100 College Drive, Elizabethtown, KY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP Design - Occupational Technology Building Renovation - Phase II

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.