Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Site work for a water / sewer project in Stamford, New York. Design plans call for site work for a water / sewer project.
As of November 12, 2025, an engineer has been selected for the project. Bidding is estimated for April of 2026 and construction is estimated for June of 2026. *The closed solicitation has been included below for reference: CR Number: 2123541 The Village of Stamford (Village) wishes to replace and upsize water mains, install new hydrants, valves, and other appurtenances within the Village water system. The project area includes 900 LF of water main along West Main Street, 900 LF of water main along Route 10 and 250LF of water main along Grant Place. The Village is now seeking an engineering firm to environmental review (NEPA & SEQR), design, administer, construct and close out the project as needed. Financing is anticipated to include Community Development Block Grant (CDBG) at a minimum. Other funding may be sought in addition to CDBG funding. The selected engineering firm will be responsible for complying with all funding agencies requirements Utilizing a qualifications-based process, the Village will select a consulting engineering firm licensed in the State of New York to design, bid, administer and close out the project. The selection of the consultant will be valid for a period of three (3) years from the date of Village Board approval and the Village reserves the right to renew the selected consultant contract for an additional three (3) years. The Village of Stamford will award a contract to the engineering firm deemed most qualified to provide services as requested. The contract will include scope and extent of work as well as other essential requirements. The Village of Stamford reserves the right to reject any and all proposal. The method of Contractor Selection has not been Determined at this time. Contract term: 3 years County(ies): All NYS counties Location: Village of Stamford
Design
Water / Sewer
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Multiple Locations, Stamford, NY
Related To This Project
Stamford, NY
Bid Date: Aug 12 2025
Stamford, NY
Bid Date: Nov 05 2025
Stamford, NY
--
Stamford, NY
Bid Date: Sep 26 2024
Stamford, NY
--
Stamford, NY
Bid Date: Apr 01 2024
Stamford, NY
Bid Date: Apr 01 2024
Stamford, NY
Bid Date: Apr 01 2024
Stamford, NY
Bid Date: Jan 17 2024
Stamford, NY
Bid Date: Jul 13 2023
Stamford, NY
Bid Date: Feb 06 2023
Stamford, NY
Bid Date: Oct 22 2021
Stamford, NY
Bid Date: Nov 18 2019
West Nyack, NY
Bid Date: Jul 07 2025
Rush, NY
Bid Date: Aug 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
