Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2025 at 8:00 PM
Updated November 14, 2025
Site work, paving and outdoor lighting for a transportation facility in Burlington, Iowa. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.
Installation of MITL LED Lighting System with Arctic Kits Installation of new continuous conduit system Replacement of bare counterpoise conductor system Replacement of directional taxiway guidance signs (LED) Replacement of incandescent fixtures with LED fixtures Pavement Removal and topsoil installation . Replacement of existing guidance sign panels Placement of off-site Topsoil at pavement removal location. Seeding/Mulching 3-19-0010-050-2025 Site Directions: Southeast Iowa Regional Airport: 2515 Summer St Burlington, IA 52601 (319) 754-1414 Each bid shall be accompanied by a Bid Bond in an amount equal to five (5%) of the total amount of the bid. Bid Bonds must be on the form provided with the Contract Documents. The Bid Bond may be forfeited and the proceeds retained as liquidated damages if the bidder fails to execute a contract or file acceptable performance bonds or provide an acceptable certificate of insurance within fifteen (15) calendar days after the acceptance of his proposal by resolution of the Airport Authority. No bidder may withdraw a proposal until after September 1, 2025. Phase 1A* Sept 22, 2025 7 calendar days Sept 28, 2025 $1,500/ calendar day Phase 1B** Sept 29, 2025 21 calendar days Oct 19, 2025 $1,500/ calendar day Phase 2** Oct 20, 2025 21 calendar days Nov 9, 2025 $1,500/ calendar day Closeout Final Inspection 14 calendar days After final inspection $250/ calendar day Phase 1A* April 13, 2026 7 calendar days April 19, 2026 $1,500/ calendar day Phase 1B** April 20, 2026 21 calendar days May 10, 2026 $1,500/ calendar day Phase 2** May 11, 2026 21 calendar days May 31, 2026 $1,500/ calendar day Closeout Final Inspection 14 calendar days After final inspection $250/ calendar day This project is subject to the requirements of 49 CFR Part 26 Disadvantaged Business Enterprise Participation. The owner has established a contract goal of 1.36 percent participation for small business concerns owned and controlled by qualified disadvantaged business enterprises (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet the established goal. The right is reserved, as Southeast Iowa Regional Airport Authority may require, to reject any and all bids and to waive any informality in the bids received.
Award
Transportation Terminals
$579,857.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
September 22, 2025
2515 Summer St, Burlington, IA
Related To This Project
Burlington, IA
--
Burlington, IA
--
Burlington, IA
Bid Date: Dec 16 2025
Burlington, IA
Bid Date: May 13 2025
Burlington, IA
Bid Date: May 20 2025
Burlington, IA
Bid Date: Jun 24 2025
Burlington, IA
Bid Date: Jul 08 2025
Burlington, IA
Bid Date: Aug 07 2025
Burlington, IA
Bid Date: Mar 25 2025
Burlington, IA
Bid Date: Mar 06 2025
Burlington, IA
Bid Date: Mar 06 2025
Burlington, IA
Bid Date: Mar 06 2025
Burlington, IA
Bid Date: Mar 13 2025
Burlington, IA
Bid Date: Mar 04 2025
Burlington, IA
Bid Date: Jan 23 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
