BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 16, 2025

Site work for a transportation facility in King City, California. Completed plans call for site work for a transportation facility.

Goals for minority participation for each trade: 28.9% Goals for female participation in each trade: 6.9% The site of the work is located within the limits of the Mesa Del Rey Airport, City of King, California. Question Deadline 04/08/2025 Questions Received Less Than 7 Calendar Days Prior to the Date of the Bid Opening Will Not Be Answered ll questions relative to this project prior to the opening of bids shall be submitted in writing to the Engineer for the project: Mr. Joseph Bradshaw, PE Kimley-Horn and Associates 10 Almaden Boulevard, Suite 1250 San Jose, CA 95113 (Tel: 669-800-4130) joseph.bradshaw@kimley-horn.com This work shall include installing the associated PAPIs, REILs, conduits, circuits, and a duct bank along Runway 11 for installation REIL and PAPI infrastructure at the Mesa Del Rey Airport. COMPLETION OF WORK: All work must be completed within one hundred and fifty (150) calendar days, after issuance date of Notice to Proceed for Construction by the Owner. All proposals or bids shall be accompanied by a cashier's check or certified check payable to the order of the City of King amounting to 10 percent of the bid, or by a bond in said amount and signed by the bidder and a corporate surety, payable to said City. Said check shall be forfeited, or said bond shall become payable to said City in case the bidder depositing the same does not, within fifteen (15) days after written notice that the contract has been awarded to him: (a) enter into a contract with the City and (b) furnish certificates of insurance and endorsements, a bond of faithful performance and a payment bond as described in the Special Provisions. Workman's compensation insurance, faithful performance bond in the amount of 100 percent of the total bid price, a labor and material bond in the amount of 100 percent of the total bid price, and a guarantee bond will be executed as part of the contract agreement. No bid will be considered unless it is made on the forms furnished by the City of King and is made in accordance with the details of the Special Provisions. Further information regarding the work or these specifications can be obtained by calling Erica Sonne at (831) 386-5932.

Post-Bid

Transportation Terminals

$562,000.00

Public - City

Site Work

22

14

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
14
Bidding Soon
598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

250 Airport Rd, King City, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.