BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work for a water / sewer project in Harrison, Arkansas. Conceptual plans call for site work for a water / sewer project.

The SPG Water Association isinterested in acquiring the services of an Engineer to provide thenecessary engineering services toprepare plans and specificationsand oversee the project "The project consists of design and observation of the rehabilitation and improvements of a50,000 gallon standpipe and a67,500 gallon standpipe locatedoff of U.S. Highway 65 in Searcy County. The work will consist ofsandblasting and repainting theinterior and exterior of both tanks, extension of the overflow, installation of a dynamic mixing system, installation of additionalmanways, SCADA, and other improvements to bring both tanksinto compliance with the ArkansasDepartment of Health. Engineershall also provide assistance incompletion of other miscellaneous items needed in the system." The total estimated construction cost of the project is unknown at this time. The maximum amount of funds available for an engineering contract may not exceed the standard percentage of construction costs used by the funding source administrationguidelines. Requests for funds exceeding the available maximum may be considered by the SPG Water Association based on themerits of the request. The type ofexperiences desired are experience with state and federal compliance, experience planning and designing water tank rehabilitation projects, experience working on same type projects, experiencewith field supervision, and experience procuring construction contractors by competitive sealed bidprocurement. Performance willbe assessed in terms of timeliness, completing work withinbudget, and quality of work. Capacity will be evaluated in termsof number and type of staff to be assigned tasks, staff experience,and staff time availability. Theproposal obtaining the highesttotal score in the evaluationprocess will be awarded the contract. The SPG Water Association isan Equal Opportunity/AffirmativeAction Employer. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$400,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
39
Bidding Soon
678
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

Project location map

US-65, Harrison, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.