BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated April 2, 2025

Renovation of an educational facility in Springville, Utah. Completed plans call for the renovation of a educational facility.

Addition of a new air-cooled chiller to the HVAC system, set within a newly constructed chiller compound made of chain link fence with slates at Spanish Oaks Elementary and Westside Elementary. The contractor is required to make modifications to the existing boiler room to accommodate a new two-pipe cooling and heating system. Additionally, sections of the existing piping throughout the mechanical mezzanine will be replaced to support this upgrade. Budget: $1,500,000.00 Start Date: June 1, 2025 Completion Date: August 1, 2025 Liquidated Damages: $500 per day Questions Due: March 24, 2025 by 1:00 pm This project is TAX EXEMPT Trades: demolition, cast-in-place concrete, plumbing, HVAC, testing & balancing, electrical, chain link fences & gates, site furnishings. The project consists of: 1. Demolition of the existing pumps, and piping indicated on drawings. 2. Installation of the owner provided air cooled chiller. 3. Installation on new building pumps and Vfds, boiler pumps, and chiller pump. 4. Installation of new expansion tank and new air separator. 5. Draining and storing existing glycol from the area of system being demoed and reworked as needed. 6. Bring existing glycol % up to 30% and bring existing inhibitors up to 2-3% of the system volume. 7. Balancing new pumps and equipment. 8. Upgraded existing DDC controls and BMS for the entire building. B. Alternate #1 Work 1. Demolition of the existing heating boiler. - Alternate #1 2. Installation of new high efficiency boilers - Alternate # 1 3. Installation of new boiler pumps - Alternate # 1 C. It is the intent that this construction shall be completed as soon as possible or before August 3, 2025. Project Location: 740 W Center St, Springville, UT 84663 Owner: Nebo School District D. Contract Documents dated March 2025 were prepared for the Project by Olsen & Peterson Consulting Engineers, Inc, 14 East 2700 South, Salt Lake City, Utah, 84115. E. The Work will be constructed under a single prime contract.

Post-Bid

Educational

$1,500,000.00

Public - County

Renovation

26

11

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
82
Bidding Soon
944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 26, 2025

Project location map

740 W Center St, Springville, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.