BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2025 at 8:00 PM

Updated April 4, 2025

Site work for a water / sewer project in Pueblo, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000380294 GENERAL DESCRIPTION OF WORK: Furnish all materials, equipment, labor and supervision required for a proposed exterior coating system ; blast to SSPC-SP6; lead paint abatement, install new epoxy and primer coating to the tank exterior; inspection and touch up; and all other appurtenant work on the Jones #1(3MG) and Jones #2 (3 MG) Steel Water Storage Tanks at the Jones Pumping Station, 4141 Wiedner, Pueblo, Colorado 81008 Tank dimensions are: Diameter 106'-6", height is 45 feet. Total Estimated Exterior (SF)15048.5 (Each), not including overflow pipe. SEE INCLUDED SPECIFICATION PACKET FOR ADDITIONAL DETAILS. BASE BID. Jones Tanks 2-3MG steel tanks exterior coating system (15,049 SF each) including lead paint abatement, surface preparation, exterior paint, and cleanup. Question Deadline 03/27/2025 at 3:00 PM MT Questions are submitted online Yes PERIOD FOR COMPLETION: Pueblo Water will award the contract by April 22, 2025. Construction to commence September-October 2025. The completion of the total contract is required by December 3, 2025. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - Insurance Required - License Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % BIDS: Each bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid amount. Any bid submitted after the time and date specified will not be considered. Pueblo Water reserves the right to reject any and all bids, or to accept that bid or proposal which in their opinion best serves the interest of Pueblo Water. The date of starting work shall be fixed in a written notice from the Engineer to the Contractor, which notice shall be mailed to, or served upon, the Contractor, not less than ten (10) days before the starting date fixed therein. The Contractor shall commence the work on or before the starting date fixed in said notice and complete the work as herein described.

Post-Bid

Water / Sewer

$1,250,000.00

Public - City

Site Work

3

5

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

September 1, 2025

Project location map

4141 Widener St, Pueblo, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.