Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2025 at 8:00 PM
Updated March 28, 2025
Site work, paving and new construction of a mixed-use development in Tempe, Arizona. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Tempe Town Lake Upstream Dam Bridge project will span the north and south bank of the upstream portion of Tempe Town Lake, at roughly Dorsey Lane. The proposed project will be similar to the Elmore Pedestrian Bridge on the downstream portion of Tempe Town lake. The project will directly link from the South Pier development (on the south side of Town Lake along Rio Salado Parkway) to the north side of the lake and the Rio Salado North bank path (future). The South Pier development is also contributing funds to this project to assist in construction costs and integrate the bridge and the development seamlessly. The proposed project will utilize the existing upstream dam pier caps to provide the substructure for a low-stress, off-street pedestrian and bicycle bridge that will connect the north and south banks of Rio Salado Multiuse Paths. The project will include rest nodes with shade, public art, architectural lighting, and landscaping. The project creates a direct, safe and continuous off-street connection to the surrounding communities, greatly reducing travel distance and potential vehicular/bicycle/pedestrian conflicts at busy arterial streets. The Rio Salado path system touches portions of the off-street bicycle facilities of Tempe, Scottsdale, Phoenix, and Mesa. This project would directly connect the eastern end of the north and south banks of the Rio Salado and miles of regional shared-use paths. Staff is currently pursuing multiple IIJA grant opportunities for the final design and construction of the project in FY 25-27. Staff is requesting transit funding to provide for the required local match/contingency funding, should an eventual federal grant be awarded The project is included in the City of Tempe's 2025-2029 Capital Improvement Program (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$30,500,000.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Multiple Locations, Tempe, AZ
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
