BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work, paving and new construction of a mixed-use development in Tempe, Arizona. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Tempe Town Lake Upstream Dam Bridge project will span the north and south bank of the upstream portion of Tempe Town Lake, at roughly Dorsey Lane. The proposed project will be similar to the Elmore Pedestrian Bridge on the downstream portion of Tempe Town lake. The project will directly link from the South Pier development (on the south side of Town Lake along Rio Salado Parkway) to the north side of the lake and the Rio Salado North bank path (future). The South Pier development is also contributing funds to this project to assist in construction costs and integrate the bridge and the development seamlessly. The proposed project will utilize the existing upstream dam pier caps to provide the substructure for a low-stress, off-street pedestrian and bicycle bridge that will connect the north and south banks of Rio Salado Multiuse Paths. The project will include rest nodes with shade, public art, architectural lighting, and landscaping. The project creates a direct, safe and continuous off-street connection to the surrounding communities, greatly reducing travel distance and potential vehicular/bicycle/pedestrian conflicts at busy arterial streets. The Rio Salado path system touches portions of the off-street bicycle facilities of Tempe, Scottsdale, Phoenix, and Mesa. This project would directly connect the eastern end of the north and south banks of the Rio Salado and miles of regional shared-use paths. Staff is currently pursuing multiple IIJA grant opportunities for the final design and construction of the project in FY 25-27. Staff is requesting transit funding to provide for the required local match/contingency funding, should an eventual federal grant be awarded The project is included in the City of Tempe's 2025-2029 Capital Improvement Program (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$30,500,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Tempe, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.