BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work, paving and new construction of a mixed-use development in Martinez, California. Completed plans call for the construction of a 120,077-square-foot, three-story above grade clubhouse / community center; for site work for a clubhouse / community center; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Located at Technology Way in Brentwood, the East County Service Center will be a three-story, approximate 120,077 GSF structure with surface parking. This will be the first regional service center of its kind for the County, co-locating ten different County Departments in one location. The project vision is, to provide a new integrated County service center for the residents of East County; that is convenient, innovative, accessible and an anchor to the community; by offering a full range of public services in a flexible, safe, and welcoming environment. The proposed new work shall comply with all applicable codes and guidelines, including the California Building Code, Title 24, Contra Costa County Building Design and Construction Guidelines. The DBE shall be responsible for all work required for the new County administrative building to obtain all required permits, operating approvals, and applicable certifications. Questions regarding this RFQ are to be in writing and directed to Gaile Suarez, (Gaile.Suarez@pw.cccounty.us) no later than 2:00 PM, April 21, 2025. If necessary, responses to questions will be issued via an addendum which will be posted on the website. The County reserves the right to reject any/all SOQs. The County looks forward to an enthusiastic response to this RFQ. Select DBE - 6/18/25 Anticipated Start Date on Preconstruction Notice to Proceed (NTP) 7/14/25 Preconstruction Phase (including GMP) 7/15/25-1/30/26 Final Design and Construction Phase 2/02/26-12/17/27 The proposed new work shall comply with all applicable codes and guidelines, including the California Building Code, Title 24, Contra Costa County Building Design and Construction Guidelines. The DBE shall be responsible for all work required for the new County administrative building to obtain all required permits, operating approvals, and applicable certifications. This goal of this project is to have Phase I Preconstruction and GMP completed by the end of December 2025 and Phase II Permit Packages and Construction completed by end of December 2027.

Post-Bid

Clubhouse / Community Centers

$130,000,000.00

Public - County

LEED Certification, New Construction, Paving, Site Work

21

7

435

4

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
24
Bidding Soon
2,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

January 5, 2026

Project location map

Multiple Locations, Martinez, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.