BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work for a mixed-use development in East Fayetteville, North Carolina. Completed plans call for site work for a medical facility.

Repurpose the fountain at the Building no. 1 historical entrance by turning it into a planter. Remove current plumbing, top-interior layer of tile veneer, bump-out for plumbing located in the northeast corner of the fountain (see Photo no. 4), water and debris inside the fountain, and electrical back to the source. Relabel the circuit breaker to be a spare. Once all piping, plumbing, and ancillary items are removed; drill holes at the bottom of the basin. Place planting soil inside the basin to a later determined height. Remove and replace the tile on the top of the fountain with a natural earth-tone stone tile. Soft wash the outside siding of the fountain when finished. Magnitude of Construction: Between 25,000 and 100,000 See Statement of Work for details. This is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. NAICS: 236220 | Size Standard: 45.0 Million Visit: Wednesday, April 30, 2025 at 10:00 AM EDT. Location: Fayetteville VAMC, 2300 Ramsey St. Fayetteville NC 28301 Front of Main building at the fountain. s Due Date: Wednesday, May 8, 2025 NLT 2:00 PM EDT. Submit all s to the Contracting Officer, Angelo Harris, via email at Angelo.Harrisva.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Repurpose the fountain at the Building no. 1 historical entrance by turning it into a planter. Remove current plumbing, top-interior layer of tile veneer, bump-out for plumbing located in the northeast corner of the fountain (see Photo no. 4), water and debris inside the fountain, and electrical back to the source. Relabel the circuit breaker to be a spare. Once all piping, plumbing, and ancillary items are removed; drill holes at the bottom of the basin. Place planting soil inside the basin to a later determined height. Remove and replace the tile on the top of the fountain with a natural earth-tone stone tile. Soft wash the outside siding of the fountain when finished. Contractor to complete construction within 90 calendar of the Notice to Proceed. Any s regarding this announcement and all future announcements regarding this project be emailed to the Contract Specialist, Angelo Harris, at angelo.harrisva.gov.

Post-Bid

Medical

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
156
Bidding Soon
1,829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 4, 2025

Project location map

2300 Ramsey St, East Fayetteville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.