Published March 27, 2025 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a mixed-use development in Chattanooga, Tennessee. Completed plans call for the renovation of a stadium; and for site work for a playground / park / athletic field.

Hamilton County Schools (HCS) seeks to contract with a professional, experienced, and qualified Tennessee registered General Contractor experienced in the installation of synthetic turf sports fields, track fields, and associated athletic stadium seating to furnish all materials and Labor to complete the construction work as outlined within the HCS provided plans and specifications. These terms and conditions shall be part of the Contract. HCS reserves the right to negotiate other terms and conditions it deems appropriate and necessary under the circumstances to protect the public's trust. Throughout this document the terms Proposer, Contractor, Company, Vendor, Firm or Bidder are used interchangeably and refer to any organization submitting a response to any solicitation. Additionally, the words terms, quote, bid, proposal are used interchangeably and refer to the submission in response to any solicitation. Hamilton County Schools, will be referenced as "HCS". The Hamilton County Board of Education reserves the right to reject any or all bids or any part thereof, to waive technicalities and informalities, and to award a contract to other than the low bidder. The right is reserved to reduce or increase the quantity of any item; and to award contract by item number, or group of items. Price, quality, and suitability will be considered in awarding bids. Samples to be submitted by the bidder upon request. Award will be made to the most responsive, responsible bidder(s) meeting specifications, who presents the product of service that is in the best interest of HCS. HCS reserves the right: (1) to award bids received on the basis of individual items, or groups of items, or on the entire list of items; (2) to reject any or all bids, or any part thereof; (3) to waive any informality in the bids; and (4) to accept the bid that is considered lowest and best. The Vendor shall maintain the following minimum insurance requirements throughout the duration of the Agreement. HCS reserves the right to request additional documentation or additional policies be provided at its sole discretion and where deemed in its best interest. HCS in no way represents that the insurance required is sufficient or adequate to protect the Vendor's interest or liabilities. A bidder may be required, before the award, to show to the complete satisfaction of HCS that it has the necessary facilities, ability, insurance, and financial resources to provide the service or goods specified. The Contract Period is expected to begin May 5, 2025 or soon thereafter. Demo work related to the Stadium Seating may not begin until authorized by the HCS Facilities Director in the field. Final Completion of work related to the Stadium Seating shall be no later than December 31, 2025. Each bid must be accompanied by a Bid Bond in the amount of 5% of the proposed dollar amount (including applicable Alternates) must be submitted with the bid. Failure to provide a valid Bid Bond at the time of bid submission shall deem Contractor Non-Responsive and therefore ineligible for evaluation and award. Vendor shall provide a Performance & Payment Bond meeting the HCS requirements for 100% of the Project Total from a surety company authorized to do business in the state of Tennessee or other form satisfactory to HCS. Fees/costs associated with procuring any bonding shall be at the sole expense of the Vendor and such shall be covered by the Project Total provided by Vendor for the associated Project. Vendor must provide pricing for all locations and associated work as specified herein. Failure to provide a proposal and related pricing that encompasses all location may deem Vendor Non Responsive at the sole discretion of Hamilton County Schools. All work shown for each location must be included in the proposal submitted. All other project documentation including addenda will be posted to the project webpage at the HCS Vendor Registry platform. It shall be the sole responsibility of the Vendor to check Vendor Registry for project related postings for additional information and project status details. This project is currently undergoing plan review as led by the project architect. Any material changes to plans or specifications will be communicated with the project awarded Contractor. Material changes may be addressed by way of contingency use or changed order at the discretion of HCS. All permitting requirements and associated fees are the sole responsibility of the awarded Contractor. QA date 31 March 2025 5 PM All questions pertaining to this solicitation must be submitted electronically to doe_purchasing@hcde.org

GC Bidding

Playgrounds / Parks / Athletic Fields

$900,000.00

Public - County

Renovation, Site Work

40

13

16

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Site Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
56
Bidding Soon
899
All Active Projects
404
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

img_map_placeholder

Multiple Locations, Chattanooga, TN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Athletic Projects: Turf, Track & Stadium Seating at SMMHS, EHHS, OHS

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.