EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Chattanooga, Tennessee. Completed plans call for site work for a water / sewer project.

The Project Work to Be Bid on is as Follows:demolition of an Existing Sewage Pumpingstation, Electrical Equipment, Fencing, Andother Site Appurtenances and Constructionof a New Submersible Pumping Station Withthree New Pumps, Valve Vault, Flowmeter,bypass Pump Connection, Electrical Controland Power Cabinets With Shelter, Concretepads, 47 Lf of 24-inch Gravity Sewer Main,two 6' Diameter Manholes, Bypass Pump-ing, Site Grading, Drainage, Stone and as-phalt Paving, and Other Appurtenancesrequired for a Complete, Functional Instal-lation. The Project Allotted Time for Constructionis: 210 Calendar Days to Substantial completion, and 240 Calendar Days To final Completion. Prior to Mailing the Check You can scanandemailacopytobidinfo@chattanooga.gov. Once the Email has Been Received With a Copy of Thecheck the Requested Bid Documents Will Beemailed. No Part of the Purchase Price Willbe Refunded. Each Bid Must Be Accompanied by a Bidbond, Prepared on the Form of Bid Bondattached to the Contract Documents or Asurety Company's Standard Bid Bond,duly Executed by the Bidder as Principaland Having as Surety Thereon a Suretycompany Licensed to Do Business in Thestate of Tennessee and Listed as a Certifiedcompany in the Latest Issue of U.s. Treas-ury Circular 570, in the Amount of Five Per-cent of the Bid. No Bid May Be Withdrawn Within 120 Cal-endar Days After the Scheduled Time for Re-ceipt of Bids. AllBidders Must Be Licensed and Shallcomply With All Requirements of the Stateof Tennessee Contractor's Licensing Act. online Fospecific Contract Information. The City of Chattanooga is an Equal Op-portunity Employer.any Contract or Contracts Awarded Undethis Advertisement for Bids Are Expectedto Be Funded With Local Funds in Addition Tofunds Indicated Elsewhere.the Owner Will in No Way Be Liable for Anycosts Incurred by Any Bidder in the Prepa-ration of Its Bid in Response to This Invita-tion to Bid.the Successful Bidder for This Contract Wilbe Required to Furnish a Satisfactory Per-formance Bond and Payment Bond Eachin the Amount of 100 Percent of the Bid. The Owner Reserves the Right to Reject Anor All Bids, to Waive Informalities and To readvertise.

GC Bidding

Water / Sewer

$600,000.00

Public - City

Site Work

33

27

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Hooks, Lifts, Material Storage, Bulk Material Storage, Material Storage Tanks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
87
Bidding Soon
929
All Active Projects
460
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

img_map_placeholder

Multiple Locations, Chattanooga, TN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Tiftonia Pump Station #2 Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.