Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 24, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Harlingen, Texas. Completed plans call for site work for a pre-engineered storage facility; for paving for a pre-engineered storage facility; and water / sewer project.
A. This item shall consist of all required testing and inspection services required to provide certification that the completed construction is in substantial compliance with the contract, plans and specifications. B. Testing and inspections shall include: all underground utilities (water, sewer & drainage), roadway embankment, subgrade, base & asphalt, curbs of all types, concrete pavements, concrete structures, signage, striping, and all other facilities as may be included in the overall scope of construction. C. Inspections may include observations to determine compliance with the prescribed stormwater pollution prevention plan (SW3P), trench safety, personal protection equipment and traffic control plans. D. The ENGINEER has the authority to observe, test, inspect, approve, and accept the work. The ENGINEER decides all questions about the quality and acceptability of materials, work performed, work progress, Contract interpretations, and acceptable Contract fulfillment. The ENGINEER has the authority to enforce and make effective these decisions. E. The ENGINEER acts as a referee in all questions arising under the terms of the Contract. The ENGINEER's decisions will be final and binding. Reference Number 0000380441 Warehouse Yard Site Improvements Question Acceptance Deadline 04/16/2025 01:00 AM EDT Questions are submitted online No
GC Bidding
Warehouse / Distribution - Pre-Engineered Storage Building
$350,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 5, 2025
114 S L St, Harlingen, TX
Related To This Project
Harlingen, TX
--
Harlingen, TX
Bid Date: Apr 22 2025
Harlingen, TX
Bid Date: Apr 22 2025
Harlingen, TX
Bid Date: Apr 23 2025
Harlingen, TX
Bid Date: Aug 28 2019
Harlingen, TX
--
Harlingen, TX
Bid Date: May 15 2025
Harlingen, TX
--
Harlingen, TX
Bid Date: Apr 16 2025
Harlingen, TX
Bid Date: Mar 18 2025
Harlingen, TX
Bid Date: Mar 27 2025
Harlingen, TX
Bid Date: Mar 27 2025
Harlingen, TX
Bid Date: Mar 25 2025
Harlingen, TX
Bid Date: Mar 25 2025
Harlingen, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.