BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2025 at 8:00 PM

Updated July 1, 2025

Site work for a water / sewer project in Hallsville, Missouri. Completed plans call for site work for a water / sewer project.

As of June 30, 2025, project is awarded to Schulte Supply for Neptune Meters in the amount of $74,451.80. The City ofHallsville is seeking qualified vendors to submit proposals for the procurement and implementation of an Advanced Metering Infrastructure (AMI) / Automatic Meter Reading (AMR) system for the City's water distribution system. The goal is to replace the current AMI/AMR system to enhance meter accuracy, improve billing efficiency, reduce water loss, and optimize operational effectiveness. To receive the RFQ/RFP package, please contact City Administrator Kenyetta Ridgway-Sample at cityhall@hallsvillemo.org or view the details on the City's website The selected vendor shall provide a comprehensive auto-read water meter system, including but not limited to: 1. Water Meters - Supply automated (AMI/AMR-compatible) water meters to replace existing meters. 2. Communication Infrastructure - Provide necessary hardware and software to enable real-time or periodic data transmission. 3. Meter Data Management System (MDMS) - Implement a platform for data collection, storage, and integration with the City's billing system. 4. Software Integration - Ensure compatibility with the City's existing utility billing software. 5. Training & Support - Provide training for City personnel on system operation, data analysis, and troubleshooting. 6. Ongoing Maintenance & Technical Support - Offer continued system support, including software updates and troubleshooting assistance.

Award

Water / Sewer

$74,452.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
36
Bidding Soon
413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 6, 2025

Project location map

To Be Determined, Hallsville, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.