BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Renovation of a military facility in Virginia Beach, Virginia. Completed plans call for the renovation of a military facility.

This Project involves: Contractor shall demolish 69 pole mounted 1500-watt metal halide light fixtures and the mounting hardware. All electrical junction boxes at the top of the light pole shall be demolished and replaced if not in good useable condition. Contractor shall replace all cross members and mounting hardware that are not safe and usable to support the new light fixtures. Contractor shall demolish existing start/stop switch on outside of enclosure #1. Contractor shall provide and install new start/stop switch to properly control lighting contactor. Contractor shall demolish existing timed relay and terminal block that is currently inside enclosure #1. Contractor shall provide and install 69 new LED equivalent to existing light fixtures and hardware. Contractor shall provide and install new electrical junction boxes at top of pole if not in good usable condition. Contractor shall provide and install new on/off switch on outside of enclosure #1, new terminal block and timed relay mounted inside enclosure. These components shall be rewired to energize existing lighting contactor for a complete, usable and finished product. Timing function shall be off delay with adjustable timing range of 0.1-10.0 HRS. Contractor shall demolish enclosure #2 and all electrical components inside. Contractor shall provide and install new enclosure and all electrical components to control existing light poles for a complete, usable and finished product. New on/off switch shall be located on outside of enclosure #2. Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $250,000 and $500,000 Contract completion date is 120 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC. Task order award is considered notice to proceed. Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $224.08 for each calendar day of delay until the work is completed or accepted. PPIs must be submitted in writing on the attached Pre-Proposal Inquiry Form (ATTACHMENT F) to Jessica Grosso at jessica.m.grosso.civ@us.navy.mil no later than 02 April 2025 2:00 PM EDT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$500,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
0
Bidding Soon
406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

Project location map

1750 Tomcat Blvd, Virginia Beach, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.