BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work and paving for a road / highway in Willards, Maryland. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 29, 2025, project was awarded to HCE LLC , awarded amount is $61,274.86. but unable to locate in both CRM and google. Request for Proposal Broadcast Date Mar 18, 2025 4:14pm (EDT) Question Deadline 04/11/2025 at 5:00 PM ET Questions from potential Bidders are due via email to jlatchum@berlinmd.gov and nsb@dbfinc.com Lee Road Rehabilitation Paving Scope of Work The Town of Berlin is seeking Proposals for approximately 480 SY of mill and overlay along Lee Road. The existing road is a failed tar & chip road with stone bed. All questions and concerns must be submitted to Mr. Latchum; information gathered from any other individual, including other employees of the Town unless specified by Mr. Latchum, may not be used in the preparation of this bid. A small amount of spot repair, full depth restoration is anticipated, as designated by the Town. The Town of Berlin seeks to enter into a contract with a qualified Contractor for the milling and overlay of the existing Lee Road, and all ancillary work for the Town of Berlin's Lee Road Rehabilitation Paving Project. All work shall be performed in accordance with the Contract Documents, including this RFP, Drawings, Technical Specifications, and the applicable general requirements of the Town of Berlin Design and Construction Standards for Water, Sewer, and Roadway Systems. B. SPECIFICATIONS 1. The existing road shall be milled 2" down, with millings being recompacted as a road base. Road base to be compacted to at least 95% compaction as measured by modified proctor. 2. The compacted road base shall then be overlayed with 2" of bituminous concrete base course, and with 2" of bituminous concrete surface course, with a tack coat between the base and surface courses. 3. Where marked by the town, full depth restoration to occur consisting of excavation 6" of existing roadbed, below the 2" mill, and backfilling with 4" of graded aggregate base course with rolled compaction. 4. At the existing fence gate, the existing road elevation must remain the same after road rehabilitation. This will require deeper excavation/milling to install the 4" of bituminous concrete being installed. The Contractor shall provide a 20ft transition in each direction of the road for tying in the grades. 5. Topsoil tie-in is required for this project. 6. Maintenance of Traffic is not anticipated to be necessary for this project, however at the request of the Contractor, the Town is willing to assist with traffic control along Purnell Crossing Road. Contractor to provide 72-hour notice prior to requesting the services of the Town. 7. Measurement of the bituminous concrete will be made horizontally along the top surface width and length for calculation of square yard surface area. ALTERNATIVE BID SCOPE: 8. Instead of the 2" base course and 2" surface course, a single 2" layer of surface course is to be installed following the 2" mill and compaction of the roadbed with a tack coat between the surface course and existing surface

Award

Roads / Highways

$61,275.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
133
Bidding Soon
1,342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

Lee Rd, Willards, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.