BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 11, 2025

Remodeling and renovation of a municipal facility in Butte City, Idaho. Completed plans call for the remodel of a municipal facility.

Project Description: The approximately 4,000 square foot historic Utility Building will be rehabilitated with new electrical, plumbing, telecommunications, ventilation and climate control systems, and updated fire suppression system. Building envelope will be improved with interior wall and exterior roof insulation. Office space will be relocated and a new restroom and kitchenette will be added. New interior finishes will be installed and the existing wood ceiling will be revealed and restored. The roof membrane, man doors, and garage doors will be replaced and the historic windows will be preserved and repaired throughout. Wood surfaces will be repainted or refinished and masonry surfaces cleaned and repointed. Shop spaces will be outfitted with ventilation and safety equipment such as, but not limited to, vent hoods and eye wash stations. Due to the historic nature of the building, construction must comply with State Historic Preservation Office (SHPO) standards as approved and integrated into the design. A new storage building of approximately 1,600 square feet will also be constructed adjacent to the existing historic Utility Building to accommodate snow equipment. The building will be minimally heated and will include vehicle wash bays and utility sinks for summer use. The new storage building will be constructed as slab on grade with integrally insulated CMU wall construction and metal roof deck with TPO membrane and include large overhead sectional doors. Both buildings will receive associated site sewer, electrical and water utility connections, data and telecommunications to the NPS network, regional power company equipment, and adjacent facilities. But not limited to please review the specifications for more information. Prevailing Wages Apply. Contract duration = 550 calendar days

Post-Bid

Municipal

$500,000.00

Public - Federal

Remodeling, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
1
Bidding Soon
173
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

April 28, 2025

Project location map

To Be Determined, Butte City, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.