BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Renovation of a transportation facility in Millis, Massachusetts. Completed plans call for the renovation of a transportation facility.

Project Lansing Millis Train Station Restoration Question Deadline 04/11/2025 at 4:00 PM ET Technical questions regarding this bid should be directed in writing to Michael Guzinski via email to kbouret@millisma.gov Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Contractor shall take all precautions necessary to comply with the EPA standards and requirements outlined in the EPA's Lead based Paint renovation, repair, and paint program. ii. Contractor shall post signs clearly defining the work area and notify public to stay out of the work areas during the renovation. iii. Contractor shall evaluate all rafter tails for rot or damage that will support new facia nailing. In base contract include in his base bid sistering new 2x rafter tails to provide a new nailing surface for 20 rafter locations. Contractor owns blocking between rafters to support nailing of the splicing of facia boards and soffit panels. E. Anchor woodwork Secure to grounds, blind nailing as req countersunk and filled flush with woodwork. F. Miter inside and outside corners. Scarf joints. G. Install continuous pieces in longest possible lengths. H. Carefully scribe work that is against other building materials, leaving gaps of 1/16-inch maximum. Scribe and cut work to fit adjoining work, refinish cut surfaces and repair damaged finish at cuts Install the work plumb, level, true and straight with no distortions. Shim as required using concealed shims. Install to a tolerance of 1/8-inch in 8'-0" for plumb and level (including countertops); and with 1/16-inch maximum offset in flush adjoining surface, 1/8-inch maximum offsets in revealed adjoining surfaces I. Contractor shall evaluate all rafters tails for rot or damaged that will support new facia and soffit work and nailing. In BASE BID pricing sistering 2x rafter tails and blocking required to provide a new nailing surface for 20 rafter bay locations. Contractor owns blocking between rafters to support nailing of new facia board splices

Award

Transportation Terminals

$230,690.00

Public - City

Renovation

21

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
764
Active Projects
385
Bidding Soon
4,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

April 28, 2025

Project location map

64 Exchange St, Millis, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.