BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 7, 2025

Site work and new construction of a fire / police facility in Seguin, Texas. Completed plans call for the construction of a 30,000-square-foot fire / police facility; and for site work for a fire / police facility.

Reference Number 0000396914 The City of Seguin is seeking qualifications from vendors for the design and buildout of a new 100' x 60', 5 bay apparatus enclosure at Fire Station #2 located at 650 Hwy 46 S. Seguin, Texas, 78155. The city has recently purchased two additional apparatuses for the fire department. As of now, we already have several pieces of equipment left out in the elements. This new building will serve as protection for existing equipment as well as new equipment purchased. We will also like to include a supply room, storage room, and gym. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Question Deadline 09/12/2025 Questions must be received via Bid Net Contract Award (estimate) Oct./Nov. 2025 To Prospective Vendors, The City of Seguin is seeking qualifications from vendors for the design and buildout of a new 100' x 60', 5 bay apparatus enclosure at Fire Station #2 located at 650 Hwy 46 S. Seguin, Texas, 78155. The city has recently purchased two additional apparatuses for the fire department. As of now, we already have several pieces of equipment left out in the elements. This new building will serve as protection for existing equipment as well as new equipment purchased. We will also like to include a supply room, storage room, and gym. Project Overview: Attached to this RFQ is a scaled sketch to reference. We propose this will be a 26 gauge minimum pre-engineered and insulated metal building. It shows three, 12' bays and two, 14' bays at 14' high. Within the building, we would like two insulated, air-conditioned storage rooms with decked ceilings for storage above. Also included will be a gym. Gym equipment will be provided by others. At the back of the building, we will need an 8' wide overhead door into the main area. The main area of building will not need cooling, but heat is required to keep the apparatuses above freezing temperatures during the cold season. We would like a fan in the main area to circulate air. Each apparatus will need a 30-amp plug mounted above the apparatus with a drop. Site work and flat work should be included in the proposal along with all MEP services. Please submit your qualifications and a proposed budget that includes civil, MEP, and architectural services, pre-construction and construction services, insurance, and bonds.

Post-Bid

Fire / Police

$490,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

179 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
83
Bidding Soon
2,499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

June 1, 2026

Project location map

650 TX-46, Seguin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.