EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Springfield, Massachusetts. Completed plans call for the renovation of a water / sewer project.

The Springfield Water and Sewer Commission through its CPO, is seeking bids from qualified Contractors to replace railings and stairs at loading dock entrance at 71 Colton Street Springfield MA, 01109. Contractor will be responsible for furnishing all labor, equipment, and materials required to complete the work. Nature and scope of work: Remove existing railings and angle iron on concrete edge. Repair any damaged concrete. Install new angle iron on loading dock edge. Install low railings near west stairs. Install railing with swing gate and appropriate posts at center section. Replace east wooden stairs with galvanized stairs and railings and install concrete landing pad. Replace west metal stairs with new galvanized stairs and railings. Replace 3/8" galvanized plate in front of lift. Provide alternate pricing for painted steel materials. Provide materials submittals before construction. The time for Final Completion of this project is 90 calendar days from the date of the written Notice to Proceed. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. A single Contractor will be awarded a Commission contract. The amount of the contract is estimated not to exceed $100,000.00. The bid is governed by Massachusetts General Laws (MGL) Ch.149 and other applicable procurement Statutes. Contractor must pay prevailing wages wherever applicable. The Chief Procurement Officer/designee reserves the right to reject any and all proposals if it is in the best interest of the SWSC to do so. Question Deadline 03/27/2025 at 4:00 PM ET All questions must be made in writing and submitted via email to edward.sweeney@waterandsewer.org in order to be considered.

Award

Water / Sewer

$85,500.00

Public - City

Renovation

4

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
265
Bidding Soon
3,707
All Active Projects
1,704
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

img_map_placeholder

71 Colton St, Springfield, MA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Colton Street Superneau Operations Center Loading Dock REBID

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.