Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 16, 2025 at 8:00 PM
Updated May 15, 2025
This is a service / maintenance or supply contract in Palo Alto, California. Contact the soliciting agency for additional information.
The project purpose is to complete a leak detection survey and report for each of the three project years to provide the city with an annual report documenting system leak location and estimate of leak rate. Background In October of 2015, the Governor of California signed Senate Bill (SB) 555 into law to improve water system auditing and create water loss standards throughout the state. SB 555 requires all California Urban Retail Water Suppliers to analyze the economic benefits of leak detection. The City of Palo Alto completed the economic analysis in 2023, and the CPA has decided to move forward with soliciting a service provider to perform the leak detection work of the City's water distribution network. The City of Palo Alto owns and maintains potable water distribution and water pumping facilities for drinking water across the City's boundaries. Palo Alto manages 231 miles of water mains. The water main sizes range from 4" to 24". Over the half of the system is ACP water main. In addition to ACP the system also includes the following materials: HDPE, Ductile Iron, Cast Iron, PVC, Concrete Cylinder, Copper, Steel, and Galvanized Steel pipes. In response to ongoing drought conditions, the City is dedicated to decreasing water loss within its distribution system. Early detection of sub-surface water leaks will allow the city to promptly repair water assets and prioritize pipelines for replacement. Question Submission Deadline: April 2, 2025, 1:00pm Rights of the City of Palo Alto This RFP does not commit the City to enter into a contract, nor does it obligate the City to pay for any costs incurred in preparation and submission of proposals or in anticipation of a contract. The City reserves the right to: Make the selection based on its sole discretion Reject any and all proposals.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
June 13, 2025
Multiple Locations, Palo Alto, CA
Related To This Project
Palo Alto, CA
Bid Date: Mar 28 2025
Palo Alto, CA
Bid Date: Apr 14 2025
Palo Alto, CA
Bid Date: Apr 10 2025
Palo Alto, CA
Bid Date: Mar 26 2021
Palo Alto, CA
Bid Date: Sep 18 2020
Palo Alto, CA
Bid Date: Apr 16 2019
Palo Alto, CA
Bid Date: May 06 2025
Palo Alto, CA
Bid Date: Apr 30 2025
Palo Alto, CA
Bid Date: Apr 04 2025
Palo Alto, CA
Bid Date: Jul 09 2019
Palo Alto, CA
Bid Date: Apr 14 2025
Palo Alto, CA
Bid Date: Apr 10 2025
Palo Alto, CA
Bid Date: Apr 08 2025
Palo Alto, CA
Bid Date: May 06 2025
Palo Alto, CA
Bid Date: Apr 08 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
