EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2025 at 8:00 PM

Updated July 18, 2025

Site work and paving for a mixed-use development in West Linn, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project generally consists of a 2-inch asphalt mill and a 2-inch asphalt overlay of 10 streets throughout the City of West Linn. The project will include approximately 5,100 Tons of asphalt cement (AC) pavement, 66,000 SF of full depth AC repair, and the installation/upgrade of 22 concrete curb ramps. The project also includes a quantity of manhole/structure adjustment and thermoplastic striping. The Engineer's estimate for this project is $2,069,955. The City shall consider no bid unless the bidder is registered with the Oregon Construction Contractor Board and the bidder has complied with all prescribed public bidding procedures and requirements. The City of West Linn reserves the right to reject any or all bids, to postpone the award for 90 days, to delete certain items from the proposal, and to award the contract to the lowest responsive, responsible bidder. Question Deadline 07/11/2025 Any question related to the Invitation to bid (ITB) shall be directed to the Buyer whose name appears as the Contact on the ITB All requests for additional information or interpretation of the ITB shall be submitted to the Buyer no later than five (5) calendar days before the deadline for submission of bids. All construction contracts shall be accompanied by a bid guaranty. No bid for construction will be considered unless accompanied by a certified check, cashier's check, or a bid bond for an amount not less than ten percent (10%) of the aggregate amount of the bid by a surety company authorized to issue such bonds in the State of Oregon. The contractor shall be required to furnish non-revocable security binding the contractor to provide faithful performance of the contract in the amount of 100% of the total contract price payable to the City of West Linn. The contractor shall be required to furnish non-revocable security for the protection of all persons supplying labor and material to the contractor or any subcontractor for the performance of any work related to the contract. Payment security shall be in the amount of 100% of the total contract price and be payable to the City of West Linn. Payment security shall be in the form of a payment bond, certified check or cashier's check.

Post-Bid

Roads / Highways

$2,069,955.00

Public - City

Paving, Site Work

45

7

10

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Finish Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
32
Bidding Soon
777
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 15, 2025

img_map_placeholder

Multiple Locations, West Linn, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.