BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work for a water / sewer project in Mississippi State, Mississippi. Conceptual plans call for site work for a water / sewer project.

The purpose of this notice isto obtain information regarding: (1) the availability and capability of all qualified sources; (2) whether they are small or large businesses; HUBZone small businesses; service-disabled, veteran- owned small businesses; 8(a) small businesses; veteran-owned small businesses; woman-owned small businesses; or small disadvantaged businesses; and (3)their understanding, capabilities and experience relative to the proposed acquisition to assist the Government in determining the expectation of receiving offers from responsible contractors at fair market prices. Your responses to the information requested will assist the Government in determining the appropriate acquisition method, including whether a set- aside is possible. An organization that is not under the applicable NAICS code can submit a response to this notice, however their capabilities may/may not be assessed for the purposes of this notice. This project will require maintenance dredging within the federal navigation channel and small boat harbors to authorized depths with a production rate of at least 2,000 cubic yards (CY) per day, or 10,000 cubic yards per week, transporting dredged material safely to the designated placement sites up to 12 river milesfrom the dredging area, and then placement of the dredged material in the Government furnished placement site. Placement site types include upland, bankline, and thalweg. In addition, the upland placement sitesidentified may require earthwork, grubbing, seeding, grading, and other preparatory work to ensure effluent water leaving the designated upland placement site meets state water quality requirements. Communicating with lockmasters and maritime users to minimize impacts to vessel traffic, adjacent utilities, and dredging operations will be required. Will also be responsible for furnishing all plant, labor, operators, supervision, equipment, transportation, supplies, materials, and incidentals in order to perform the dredging work. Estimated Range: $10 - $25 Million The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$25,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
64
Bidding Soon
391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

Project location map

To Be Determined, Mississippi State, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.