Published October 27, 2025 at 8:00 PM
Updated October 28, 2025
Site work and new construction of a civil project in Port Coquitlam, British Columbia. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The City of Port Coquitlam's project is to replace the existing drainage pumps at Maple Creek with a new Drainage Pump Station which includes a new building with seismic and structural analysis, and the associated civil, mechanical, and electrical systems. The pump station will be physically situated in the City of Coquitlam at 3004 Riverbend Drive and features an intake system consisting of two (2) 250 HP Archimedes Screw Pumps with flow capacity each up to 2.5 m3/s at 4.3 m total dynamic head. Each screw pump discharges into respective 1350 mm twin discharge pipes. A new immediately adjacent flood box crossing the dike will be constructed with a self-regulating tide gate that will be closed when downstream water levels, influenced by the Coquitlam River reach pump off levels to prevent cross circulation flow that would impact fish passage. Works includes but is not limited to: excavation and disposal of materials offsite, clearing and grubbing, steel piles, cofferdam, by-pass pumping, trash rake system, bar screens, riprap, pump station building, foundation walls, monorail, MCC, self regulating tide gate, flap gates, slide gates, stop logs, flood box culvert, headwalls, retaining walls, roadside barriers, lighting and signage, and coordination with adjacent City of Port Coquitlam and City of Coquitlam projects. Documents can be obtained from www.bcbid.gov.bc.ca Question Deadline 04/08/2025 at 2:00 PM PT
Award
Water / Sewer
$10,849,831.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
July 2, 2025
Multiple Locations, Port Coquitlam, BC
Related To This Project
Port Coquitlam, BC
Bid Date: Apr 24 2025
Port Coquitlam, BC
Bid Date: Apr 11 2025
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
Bid Date: May 13 2025
Port Coquitlam, BC
Bid Date: May 08 2025
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
Bid Date: Jan 21 2025
Port Coquitlam, BC
Bid Date: Jan 29 2025
Port Coquitlam, BC
Bid Date: Jan 14 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.