BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated September 25, 2025

Site work and new construction of a civil project in Aurora, South Dakota. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Aurora 250,000 Gallon Water Tower New Tower Construction, Utilities, and Site Grading o A 250,000 Gallon elevated water tower with a height to overflow of 137.5 feet and all piping, fittings, appurtenances and valves; o Storage and control room finished inside tower; o Miscellaneous site and grading work; o Approximately 600 LF of 8" Restrained Joint Watermain; o All mechanical, electrical and control equipment necessary to provide a fully functioning facility; o Corrosion protection system components including coatings, linings, and cathodic protection systems; o Temporary and permanent erosion control, reclamation and seeding; o Traffic control and haul road maintenance during construction; o Reservoir and pipeline cleaning, flushing, hydrostatic pressure testing and disinfection; o Hydrodynamic mixing system; and o Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents. Existing Tower Demolition and Site Grading o Demolition and removal of existing water tower, foundation and existing appurtenances; o Site work, grading and seeding at existing water tower location; o Clean up, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents. Bid Alternate - Salvage Existing Tank Bowl The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. A pre-bid conference will not be held. Davis-Bacon and related acts provisions apply to this project. All provisions relative to those acts must be met. Davis Bacon wage rates must be used. Question Deadline 05/15/2025 Contact information and submittal procedures for such questions are as follows: A. Joseph Munson - Project Manager Banner Associates, Inc.409 22 nd Avenue South Brookings, SD 57006 Phone: 1-605-692-6342 E-mail: joem@bannerassociates.com Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein

Award

Water / Sewer

$2,775,000.00

Public - City

New Construction, Site Work

70

29

14

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
31
Bidding Soon
356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

July 21, 2025

Project location map

102 W. Front St, Aurora, SD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.