BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work and paving for a civil project in Miami, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

If you have any questions, contact Elva Reyes at 305 375 2930. All RFI requests should be e-mailed to elva.reyes@miamidade.gov while copying the Clerk of the Board (clerk.board@miamidade.gov). Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. o Bridge at NW 22nd Avenue over Biscayne Canal Bridge (C-8) - Bridge No. 874030 o Bridge at NW 67th Avenue over Biscayne Canal Bridge (C-8) - Bridge No. 874360 Bridge rehabilitation consists of the installation of Rotation Restrainers Reinforced Concrete Block. Rotation restrainers consist of building up the top ends of the intermediate bridge supports using a reinforced concrete block underneath the sidewalk. The reinforced concrete block is connected to the existing bridge supports by means of mechanical dowels and sized to completely fill the gap between the bottom of sidewalk and the intermediate support. Work will be performed from the water by means of a floating work platform/floating dock/floating barge-type vessel and/or small work skiff. The floating platform/dock/barge will be used for material containment as well as support equipment such as compressor/generator for air/power for minor concrete removal and concrete surface preparation, and material for forming the concrete. Handheld chipping tools will be used to remove concrete and drill dowel holes. All the work for the removal of the concrete, the forming for the new pour and the casting of the concrete will be done from the work platform/dock/barge in the canal. The roadway may be used for delivery of material, such as concrete, and equipment using off-peak, daytime lane closures. The work will require the installation of turbidity barrier in the canal. Existing utilities are to remain in service and unaffected by the work. All RFI requests should be e-mailed to elva.reyes@miamidade.gov while copying the Clerk of the Board (clerk.board@miamidade.gov).

Post-Bid

Bridges / Tunnels

$34,212.00

Public - County

Paving, Site Work

15

18

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
92
Bidding Soon
1,759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

June 30, 2025

Project location map

Multiple Locations, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.