Site work and paving for a mixed-use development in Miami, Florida. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to remove the existing multiway stop control and replacing it with a traffic circle, meeting all requirements for Florida Greenbook and roundabout standards such as deflection, splitter islands, pedestrian refuge, design vehicle, lighting, etc. The upgrade of the stormwater system may be required based on the proposed design. Pursuant to Section 2-8.10 of the Code of Miami-Dade County, this Contract is subject to a user access fee under the County's User Access Program (UAP) in the amount of two percent (2%). All construction services provided under this contract are subject to the 2% UAP. This fee applies to all Contract usage whether by County Departments or by any other governmental, quasi governmental or not-for-profit entity. From every payment made to the Contractor under this contract (including the payment of retainage), the County will deduct the two percent (2%) UAP fee provided in the ordinance and the Contractor will accept such reduced amount as full compensation for any and all deliverables under the contract. The County shall retain the 2% UAP for use by the County to help defray the cost of its procurement program. Contractor participation in this pay request reduction portion of the UAP is mandatory. Provided, however, UAP shall not be applicable for total contract values, inclusive of contingency and allowance accounts, of less than five hundred thousand dollars ($500,000.00). LOCATION OF WORK: SW 109 Avenue at SW 32nd Street. LICENSE REQUIREMENTS: At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and these Solicitation and Contract Documents, the Bidder must hold a valid, current, and active: Certificate of Competency from the County's Construction Trades Qualifying Board as a General Engineering Contractor or as a Specialty Engineering Contractor, commensurate to the requirements of the Scope of Work, in one or more engineering crafts to include paving engineering contractor or electrical contractor. The specialty contractor shall subcontract with a qualified contractor any work which is incidental to the specialty but is specified in the aforementioned Code as being the work of other than that of the Engineering Specialty for which certified or, Pursuant to Section 255.20, F.S. and in lieu of the above, the County may consider a bid from a Bidder that is a duly licensed Contractor in good standing that has been prequalified and considered eligible by the Florida Department of Transportation (FDOT) under Section 337.14, F.S. and Chapter 14-2, Florida Administrative Code, to perform the work described in the Contract Documents. Contractors seeking consideration under this Paragraph shall submit along with the Bid Documents for review and consideration, current copy(ies) of their FDOT Certificate(s) of Qualification, Certification of Work Underway, and Status of Contract(s) On Hand. Acceptable FDOT prequalification(s) necessary to perform the Work specified in the Contract Documents include the Flexible Paving and Drainage Work Classes. EXPERIENCE: 1. The Bidder must demonstrate that it has full-time personnel with the necessary experience to perform the Project's Scope of Work. This experience shall include work in successfully completed projects performed by the identified personnel whose bulk of work performed in the Public Right-of-Way is similar in detail to the Project's Scope of Work described in these Solicitation Documents. Demonstrate the experience requirement by: a. Providing a detailed description of at least three (3) projects similar in detail to the Project's Scope of Work described in these Solicitation Documents and in which the Bidder's identified personnel is currently engaged or has completed within the past five years. List and describe the aforementioned projects and state whether the work was performed for the County, other government clients, or private entities. The description must identify for each project: 1) The identified personnel and their assigned role and responsibilities for the listed project 2) The client's name and address including a contact person and phone number for reference 3) Description of work 4) Total dollar value of the contract 5) Contract duration 6) Statement or notation of whether Bidder's referenced personnel is/was employed by the prime contractor or subcontractor, and 7) For completed projects, provide letters of certification of final acceptance or similar project closure documentation issued by the client and available Contractor's performance evaluations. 2. The County reserves the right to request additional information and/or contact listed persons pertaining to bidder's experience. INDEMNIFICATION AND INSURANCE REQUIREMENTS The Contractor shall furnish to Department of Transportation and Public Works, 111 NW 1 Street, Miami Florida 33128, Certificate(s) of Insurance which indicate that insurance coverage has been obtained which meets the requirements as outlined below: A. Worker's Compensation Insurance for all employees of the Contractor as required by Florida Statute 440. B. Commercial General Liability Insurance for $1,000,000 each occurrence, $2,000,000 aggregate. Products/completed operations. Miami-Dade County must be included as additional Insured C. Automobile Liability Insurance covering all owned, non-owned and hired vehicles for$1,000,000 combined single limit. D. Umbrella providing excess coverage over underlying(s) B and C for a minimum $3,000,000 each occurrence/aggregate. Terms to be not more restrictive than underlying coverages. SEA LEVEL RISE ORDINANCE Key considerations include, but are not limited to, enhancing ecological performance through the use of native vegetation and green infrastructure, and implementing flood risk reduction measures such as permeable surfaces and bioswales. All RFI requests should be e-mailed to Laura.Hernandez@miamidade.gov while copying the Clerk of the Board (clerk.board@miamidade.gov). The Department of Transportation and Public Works has made changes with regard to how addendums and requests for information (RFI) will be sent to document holders.
Post-Bid
Sidewalks / Parking Lot
$1,014,050.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2025
August 25, 2025
SW 109th Ave & SW 32nd St, Miami, FL
Related To This Project
Miami, FL
Bid Date: Apr 29 2025
Miami, FL
Bid Date: Apr 23 2025
Miami, FL
Bid Date: Mar 27 2025
Miami, FL
Bid Date: Mar 27 2025
Miami, FL
Bid Date: Mar 27 2025
Miami, FL
Bid Date: Apr 16 2025
Miami, FL
Bid Date: Apr 29 2025
Miami, FL
Bid Date: May 22 2025
Miami, FL
Bid Date: Apr 23 2025
Miami, FL
Bid Date: Apr 23 2025
Miami, FL
--
Miami, FL
Bid Date: Apr 11 2025
Miami, FL
Bid Date: Apr 17 2025
Miami, FL
Bid Date: Apr 23 2025
Miami, FL
Bid Date: Apr 30 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.