Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 11, 2025 at 8:00 PM
Updated April 17, 2025
Site work and renovation of a water / sewer project in Miami, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
(Contractor must obtain and submit all permits prior to performing any work). The project consists of furnishing all materials (except those listed in Section 4.00 "Materials and Equipment Furnished by The Department"), labor, equipment, tools and other facilities and services necessary for proper execution, testing, and completion of the work required to Upgrade Sewage Pump Station No. 0844. This includes, but is not limited to, site preparation, demolition work, installation of new structures, installation of mechanical and electrical equipment, and restoration of impacted areas. Site preparation may require clearing and grubbing prior to demolition and construction work. The Contractor shall provide uninterrupted by-pass pumping capabilities for the existing pump station flow during all construction time and until the new pump station is completely operational; the bypass system shall have a flow and head capacity equal to or greater than the proposed pumps; tested and accepted by the Owner and regulatory agencies (see by-pass requirements on Section 8.00 "Measurement and Payment"). The Contractor shall also be required to design, obtain approval, implement and maintain a Maintenance of Traffic Plan (MOT) during construction activities, as required. Additionally, the Contractor shall comply with the best management practices for stormwater pollution prevention, including control of erosion and sedimentation during construction activities, such as installing silt traps in all stormwater drainage inlets close to the project site. Demolition work includes, but is not limited to: removal and proper disposition of all internal components on the existing wet well and dry well, including but not limited to pumps, piping, valves, fittings and ladders; demolition of existing pump station control panels and other electrical equipment, including but not limited to the meter base, disconnect devices, pullout and junction boxes, and all related conduits and wiring, including the buried feed line (Note: All salvageable equipment and materials shall be given back to the Department. The remote terminal unit - SCADA/RTU - shall be removed and provided back to WASD); demolition of existing wet well top slab; removal/demolition of dray well chimney and abandon existing dry well; demolition of concrete fillets inside the wet well; demolition of approximately 25 linear feet of an existing 12-inch ductile iron pipe (DIP) force main; removal of approximately 20 linear feet of existing 8-inch suction lines; removal of existing pump station appurtenances, backflow preventer and air vent; removal of grass, and all other items deemed necessary to be removed for the successful installation of the new proposed pump station. The Contractor shall refurbish the existing wet well and modified it to be a receiving manhole, perform cores on the existing structure for the new piping, in addition to sealing the existing wall openings as required. Coordinate with Miami-Dade Water and Sewer Department (MDWASD) for the salvage of any other material and/or equipment in addition to the mentioned above. The Contractor shall furnish and install new equipment and materials such as: new valve vault with top slab and aluminum access hatch; new concrete top slab for the wet well, with aluminum access; concrete protective coating on all interior surfaces of the wet well; new duplex 45 HP submersible pumps and related equipment as specified on plans, all piping, valves, fittings and appurtenances for new pump station discharge and EPO connection; new 8-inch ductile iron pipe (DIP) discharge piping force main (approximately 48 LF total), and connecting to the existing 12-inch force main on site; 35 linear feet of 8-inch gravity sewer influent line; new sump pump and its discharge piping at the valve vault; new concrete platform for electrical controls and facilities; new concrete slab for backflow preventer; 4 linear feet of ." type K water service line, including hose bibb with backflow preventer and protective cage; new control panel, electrical service, electric meter, main disconnect, motor connection box and SCADA antenna, including mounting structures; new generator and generator fuel tank; new electrical conduits and wiring for power, controls and grounding, including grounding rods and test wells; and new aluminum guardrails. Contractor will install new remote terminal unit (RTU) with new enclosure. Contractor shall coordinate with FPL the power connection. The Contractor shall furnish and install sod, hedges, concrete pavement, and all other areas and surfaces impacted during construction (as required) to maintain the site in equal or better condition as the existing. In addition, the Contractor shall provide start up and testing of the new facilities, and other appurtenant and miscellaneous items, services, and work for a complete, satisfactory and functional installation. This may include dewatering and disposal of product water as needed. B. Pumping Station 0844 is located at 4602 SW 129th Ct, Miami, Florida 33175. C. The Department reserves the right to issue the Notice to Proceed (NTP) to the Contractor at any time after the Award Letter has been issued. D. It is the intent of the MDWASD to obtain a complete functional, satisfactory, and legally operable installation under this project, and any items of labor, equipment or materials which may be reasonably assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein. Liquidated Damages: YES $$ Per Day: $1,000.00 Anticipated Start Date: 4/21/2025 Calendar Days for Project Completion: 270 Question Deadline 04/11/2025 The RFI cut-off date is five (5) business days prior to the bid due date.
Post-Bid
Water / Sewer
$1,877,670.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
April 21, 2025
4602 SW 129th Ct, Miami, FL
Related To This Project
Miami, FL
Bid Date: Apr 29 2025
Miami, FL
Bid Date: May 22 2025
Miami, FL
Bid Date: Apr 15 2025
Miami, FL
Bid Date: May 16 2025
Miami, FL
Bid Date: May 23 2025
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Mar 27 2025
Miami, FL
Bid Date: Mar 27 2025
Miami, FL
Bid Date: Mar 27 2025
Miami, FL
Bid Date: Apr 23 2025
Miami, FL
Bid Date: Apr 29 2025
Miami, FL
Bid Date: Apr 30 2025
Miami, FL
Bid Date: Apr 23 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
