BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Renovation of a transportation facility in Hilton Head Island, South Carolina. Completed plans call for the renovation of a transportation facility.

All questions must be submitted through the Procurement Portal no later than 07/16/2025 at 5:00 PM ET Details of Airport Hilton Head Island Airport has been awarded federal funding to rehabilitate the airport's Air Traffic Control Tower (ATCT). The ATCT is a contracted tower that controls aircraft traffic for arriving and departing aircraft within the Hilton Head Island SC airspace. The ATCT is due for renovations and rehabilitation to address the outdated and deteriorated facility environment. The airport is seeking qualified contractors to submit their lowest most responsive and responsible bid that can address the prioritized items listed in the Scope of Work. The Hilton Head Island Airport Air Traffic Control Tower (ATCT) is located at: 37 Summit Drive Hilton Head Island, SC 29926 Project Description Purpose: Hilton Head Island Airports ATCT is due for rehabilitation and renovation. The building consists of: Ground-floor space containing access to the stairwell, a small hallway, a training/conference room, and an executive office. The second floor contains an electrical room housing climate control, communications and data racks, a computer station, and a small equipment closet with fire protection. The third floor includes the building's only bathroom with a sink, a breakroom with minor appliances, a sink, and a walk-out deck area. On the fourth floor is the ATCT operator area, accessed via a spiral staircase. This floor is dedicated to tower controllers and contains blacked-out paint, surround counters, and panoramic glass for 360 viewings. Outside access to the debris sprinklers and the tower roof is also located on this floor. The tower roof contains multiple weather indication equipment, antenna, and lightning control devices. Descriptions of Rehabilitation: Ground Floor: New paint and flooring throughout. Stairwell: Inspect and assess the steel fire retardant material, replace or repair as needed Second Floor: Paint, asses, repair, or replace mini split, re-organize electrical. Third Floor: Paint, flooring where required, repair damaged doors Fourth floor: Replace carpet throughout, Paint interior, Repair ceiling (leaking), assess, repair, or replace as required the drop-down access stair to the roof, Remove and install new countertop and cabinets tailored to communications and computer equipment, assess the exterior sprinkler system and repair or replace as required, and install plumbing and a Temporary Toilet system. Re-organize, remove unwanted electrical items as required. Roof: Replace or repair the roof to eliminate leaking and future wear. Assess and repair or replace the antenna and lightning control rods. If possible, remove the airfield light beacon and install it on the roof. Exterior: Assess and inspect all windows and doors. Repair or replace them with energy-efficient replacements as required. Power wash, repaint the exterior, and repair any rot or broken stucco as needed. Time: The airport encourages this project to be completed within 30 days of notice to proceed. Air Traffic Controllers' work hours conform to the commercial and General Aviation schedules. They typically open at 7:00 a.m. and close at 9:00 p.m., seven days a week. Most work can be performed during working hours, but some work may need to be performed outside of the posted work hours.

Post-Bid

Transportation Terminals

$307,218.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
1
Bidding Soon
423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

September 5, 2025

Project location map

37 Summit Dr, Hilton Head Island, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.