BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Site work for a water / sewer project in Laguna Beach, California. Design plans call for site work for a water / sewer project.

As of September 26, 2025, the previous RFP has been awarded. Information regarding a timeline for bidding and construction is not available. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The City of Laguna Beach Public Works Department invites qualified Consultants to provide a proposal for right-of-way acquisition services for the North Coast Interceptor (NCI) Reach 5 Replacement project. The project limits are between South Coast Highway and the South Orange County Wastewater Authority (SOCWA) Coastal Treatment Plant (CTP). The project will provide dual parallel pipelines to provide redundancy and the ability to maintain a reliable and safe conveyance of wastewater. The project includes: Installation of 5,200 LF of dual 18-inch high density polyethylene pipelines from South Coast Highway to just west of the SOCWA CTP. Slip lining rehabilitation using flexible fabric reinforced pipe for the remaining 900 LF of existing 24-inch NCI transmission pipeline to the headworks of the SOCWA CTP. The project design is at about 90% and right of way requirements have been preliminarily determined. The permanent and temporary construction easement is attached as Attachment 2. Your services shall be performed in accordance with the Scope of Work in Section IX. All affected properties are broken down on the Proposal Sheet in Section X. The draft plan sheets are attached as Attachment 3. The Preliminary Design Report is attached as Attachment 4. Any requests for clarification or questions concerning this Request for Proposals (RFP) must be submitted via email to Ulises Escalona, Senior Project Manager, at uescalona@lagunabeachcity.net no later than April 3, 2025, at 5:00 P.M.

Design

Water / Sewer

$9,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
723
Active Projects
339
Bidding Soon
3,573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

To Be Determined, Laguna Beach, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.