BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Renovation of a mixed-use development in Lake City, South Carolina. Completed plans call for the renovation of a educational facility.

Florence County School District 3 in Lake City, SC is accepting sealed bids for complete interior and some exterior painting of Lake City Early Childhood Center. Question Deadline 04/02/2025 at 3:00 PM ET Questions for the purpose of clarifying any part of this IFB must be delivered or emailed to: Florence County School District Three, ATTN: Mitch Driggers, Assistant Director of Maintenance and Facilities, 125 S. Blanding St., Lake City, SC 29560. E-mail: mdriggers@fsd3.org. Remove all 4' vinyl baseboard Cut out 1-5/8" of sheetrock from floor up in all VCT floor areas Replace cutout sheetrock with 1-5/8" high PVC board and attachment method will be screws to metal studs A continuous bead of silicone will be placed between the bottom of the PVC board and the VCT floor Patching of sheetrock in any place that needs to be patched. Patch cutout and replacement should be of appropriate size to make sure damaged sheetrock has been completely removed. Painting of all hallways, doors, door frames, windows, offices, rest rooms, maintenance closets, custodial closets, IT closets, and touch up of murals Gang toilets in back hallway will have floors painting with an epoxy type paint, walls are to be painted, and ceiling grids are to be painted. Painting of all classroom walls, doors, doorframes, and rest rooms inside of classrooms. Media center walls, doors and doorframes. Cafeteria and kitchen ceiling, walls, doors, door frames to be painted. (kitchen equipment to be painted around as applicable) Kitchen, pantry, dry storage, kitchen staff bathroom, and serving line areas to have floor painted with epoxy-type paint. All 4" baseboard that was removed will be replaced with 6" black standard cove base. All wooden doors to be lightly sanded and refinished. Stucco at front entrance area to be painted with appropriate exterior paint. All paints used interior will be Sherwin Williams brand in a gloss finish. Paint colors will be determined after contract is awarded All stains for doors will be clear gloss. All labor, paint, consumables and equipment to accomplish this job should be included in this pricing. Contractor will be supplied a set of keys to be able to access this building as needed. Contractor will be working alongside other trades for the duration of this contract period All work will be performed after hours and during summer break. Any work done after schools hours and during the weekend will not interfere with school functions (cleanup of complete work area must be done before the following school day). Work on the project will begin seven days after award notice and must be completed no later than July 13, 2025 Liquidated damages will be enforced at a rate of $500 per day for every day after July 13, 2025 unless for extenuating circumstances and at the District's discretion Liquidated damages will be enforced at rate of $250 per day for each day that cleanup has not been done before school starts

Post-Bid

Educational

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
0
Bidding Soon
551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

Project location map

906 N Matthews Rd, Lake City, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.