BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Site work for a water / sewer project in Fort Calhoun, Nebraska. Completed plans call for site work for a water / sewer project.

Removal of existing boulder wall structure, installation of HDPE manhole and installation of 40 LF of 12" HDPE pipe within a washout. Backfill and placement of flowable fill, restoration of boulder wall, repair of dry riverbed, and modification of existing flume and swale. Est. Completion Date: Aug. 1, 2025 Site Directions: Site is located between 1540 and 1550 Betts Circle in Fort Calhoun, NE

Award

Water / Sewer

$66,353.00

Public - City

Site Work

6

5

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
95
Bidding Soon
990
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

May 19, 2025

Project location map

1540 Betts Cir, Fort Calhoun, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.