Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 30, 2025 at 8:00 PM
Updated July 31, 2025
Site work for a water / sewer project in New Bedford, Massachusetts. Completed plans call for site work for a water / sewer project.
Reference Number 0000386404 The work of this project includes, but not limited to, the following: 1. Decommission and fill the existing underground wet well and dry well at the Howard Avenue Pumping Station. 2. Repurpose the existing building to house a new generator and odor control equipment 3. Construct a new submersible pumping station on the same site, including an underground wet well, a valve vault and a meter vault. 4. Install a new precast electrical building adjacent to the existing structure to house electrical panels. 5. Replace approximately 900 feet of influent sewer with 36-inch PVC pipe. 6. Rehabilitate approximately 935 feet of 15- to 18-inch storm drain pipe using cured-in-place pipe (CIPP) lining. 7. Rehabilitate approximately 400 feet of 14-inch forcemain using CIPP lining. 8. Roadway improvements from Woods to Howard Avenue. The Contract time shall be 540 calendar days commencing twenty days following th The project includes replacing the Howard Avenue wastewater pumping station, decommissioning the current wells, repurposing the building for new equipment, and constructing a new submersible pumping station along with a new electrical building. The project also includes rehabilitating the pump station force main, upsizing 890 feet of sewer, lining 700 feet of storm drain, and making roadway improvements from Wood St to Howard Ave. The s contaminated soil removal, site improvements, res, reconstruction, temporary construction, traffic management, and related cleanup necessary to the work. Question Deadline 06/13/2025 04:00 PM EDT are submitted online Yes Questions related to the project shall be submitted via BidNet Direct and to Wenjing (Lisa) Cheng at CDM Smith (chengw@cdmsmith.com). Bid Intent Optional Bid Intent Deadline 07/04/2025 05:00 PM EDT
Award
Water / Sewer
$17,300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
August 1, 2025
Howard Ave, New Bedford, MA
Related To This Project
New Bedford, MA
Bid Date: May 28 2025
New Bedford, MA
Bid Date: Mar 27 2025
New Bedford, MA
--
New Bedford, MA
Bid Date: Apr 17 2025
New Bedford, MA
Bid Date: Apr 23 2025
New Bedford, MA
Bid Date: Apr 10 2025
New Bedford, MA
--
New Bedford, MA
Bid Date: Apr 11 2025
New Bedford, MA
Bid Date: Apr 23 2025
New Bedford, MA
Bid Date: Apr 04 2025
New Bedford, MA
Bid Date: Mar 28 2025
New Bedford, MA
Bid Date: Mar 27 2025
New Bedford, MA
--
New Bedford, MA
Bid Date: Mar 07 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed